Similar Projects
Scattered Site Bathroom Renovations
Renovation
Design
$200,000 CJ est. value
Louisville, KY 40272

New Consolidated High School
Renovation, Infrastructure
Bidding
$1,500,000 CJ est. value
Hopkinsville, KY 42240

Jet-A Installation
Infrastructure
Post-Bid
Hartford, KY 42347

Gymnasium Entryway Replacement
Alteration
Post-Bid
Simpsonville, KY

Ready-Mixed Concrete
Infrastructure
Results
Owensboro, KY

Second Street Streetscape
Infrastructure, Alteration
Results
Pikeville, KY 41501

Concrete
Term Contract
Post-Bid
Owensboro, KY

Renovation to the Robert Cherry Civic Cener
Renovation - 9,300 SF
Results
$1,365,799 CJ est. value
Paducah, KY 42001

Ready Mix Concrete
Alteration
Post-Bid
KY

Corridor Improvements Phase 2 - Shive Lane
Infrastructure
Results
Bowling Green, KY 42128

Synthetic Turf Fields
Infrastructure
Post-Bid
Barbourville, Corbin, KY 40701

Hazelwood Exterior Concrete Repairs
Alteration
Results
$164,907 est. value
Louisville, KY 40215

Furnishing and Delivery of Flowable Fill and Concrete
Alteration
Post-Bid
Erlanger, KY

Flowable Fill and Concrete
Alteration
Results
Erlanger, KY

Central Parking Garage Restoration
Renovation, Infrastructure, Alteration
Post-Bid
Lexington, KY 40507

Last Updated 06/23/2023 08:43 AM
Project Title

8804 High Point Circle Bank Repair Project

Physical Address View project details and contacts
City, State (County) Louisville, KY 40202   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $197,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Description and location of Project: This contract provides a new gravity wall installation along the open channel along the rear of High Point Circle. All work shall be done in accordance to MSD's Standard Specifications. There will be no pre-bid meeting held for this project. The Engineer's Construction Cost Estimate for this project is between $150,000.00 and $200,000.00. Proposal forms, including Specifications and Instructions for Bidders, may be obtained from MSD's designated web portal *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Project Manager for this Invitation to Bid is Joseph Exely. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD's designated web portal at Questions received less than two days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD's Chief Engineer, David W. Johnson, P.E. MSD supplier diversity minority and woman business enterprise program policy and procedures manual (mbe/wbe program) - for construction contracts $150,000 and greater for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below: If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to a certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate "Good faith efforts" in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program). The revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) is effective June 1, 2020. If applicable, the goals are as follows: 18.0% MBE - African American, 2.0% MBE - Asian-Indian American and 15.0% WBE - Caucasian Female participation respectively required for this project. MBE and WBE businesses are encouraged to bid on this project as a prime contractor. MSD BID DISCOUNT: Applicable This MSD construction project is bid and advertised as: check applicable below The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents