Similar Projects
The Art Center Of Waco
Renovation
Conception
Waco, TX 76706

The Fred Rouse International Center and Museum for Art and Community Healing
New Construction, Demolition
Conception
Fort Worth, TX 76164

The Children's Museum
New Construction - 70,000 SF
Design
$20,000,000 est. value
El Paso, TX 79901

Museum of the Big Bend
Addition - 12,000 SF
Design
Alpine, TX 79830

Art Museum of South Texas Elevator Modernization
Bidding
Corpus Christi, TX 78401

Petroleum Museum Education Building
New Construction - 8,022 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Midland, TX 79701

Fair Park African American Museum - Repair and Renovation
Renovation
Post-Bid
Dallas, TX 75210

Man Residence Renovation
Renovation
Post-Bid
Mansfield, TX 76063

Taylor Cabin Preservation Project
Results
$189,240 est. value
Denton, TX 76201

Gibson Grant Log House
Renovation
Results
$1,436,000 est. value
Flower Mound, TX 75028

National Aviation Education Center
Build-Out - 10,000 SF
Construction
Dallas, TX 75237

Thanks-Giving Square
Renovation
Pending Verification
Dallas, TX 75201

National Medal of Honor Museum
New Construction - 25,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Arlington, TX 76011

106 West Commerce Harold Simmons Park Redevelopment
Renovation
Conception
Dallas, TX 75207

Variety of Museum and Interpretive Services
Term Contract
Post-Bid
Austin, TX 78744

Last Updated 03/16/2020 11:34 AM
Project Title

Brush Square - O. Henry Museum Restoration

Physical Address View project details and contacts
City, State (County) Austin, TX 78701   (Travis County)
Category(s) Entertainment/Recreation
Sub-Category(s) Museum
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements to the facility to include, but not limited to, HVAC improvements, building performance upgrades, window restoration, and landscape improvements in conjunction with recommendations from the Brush Square Master Plan. The Work consists of restoration of the 1,282 SF O. Henry Museum, a historic landmark building, which includes but is not limited to: removal and replacement of existing mechanical system, new fire protection system installation, new electric conduit & receptacles, new lighting and controls, structural reinforcement of floor, roof and flashing repairs, lead paint abatement as required, replacement & repair of siding and exterior wood as needed, window and door repair, and exterior landscaping improvements.

Details

Museum, 1,282 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents