Similar Projects
Deer Creek Plant Improvements - 20600 North Portland Avenue (Ward 8) - City Of Oklahoma City
Renovation
Conception
$1,546,000 est. value
Edmond, OK 73012

Kenwood Hills Water System Improvements- Construction - WL1903 - City of Broken Arrow
Renovation
Conception
$428,000 est. value
Broken Arrow, OK

Water Reclamation Facility Dewatering Centrifuge Replacement - WW0326 - City of Norman
Renovation
Design
$2,500,000 CJ est. value
Norman, OK 73072

Newcastle Wastewater Treatment Plant Improvements
Renovation
Bidding
$25,000,000 CJ est. value
Newcastle, OK 73065

Wastewater Lagoon Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Webbers Falls, OK 74470

FY '22 Water Pollution Control Capital Equipment Replacements
Alteration
Post-Bid
Tulsa, OK

2021 CDBG Wastewater Treatment Improvements
Renovation
Post-Bid
$500,000 CJ est. value
Grandfield, OK 73546

Kingfisher WWTP Rehabilitation
Renovation
Results
Kingfisher, OK

Holdenville Wastewater Treatment Plant Improvements
Renovation
Results
Holdenville, OK 74848

Hochatown - Offsite Improvements - WP #1 - Access Roadway & Facility Maintenance Building
New Construction, Infrastructure
Construction
$5,000,000 CJ est. value
Hochatown, OK 74728

FY'23 Northslope Capital Equipment Replacements
Renovation
Bidding
$467,000 CJ est. value
Tulsa, OK 74117

Wastewater Treatment Plant Improvements South Canadian Wastewater Treatment Plant
Renovation, Infrastructure
Post-Bid
$203,529,800 CJ est. value
Oklahoma City, OK 73170

Lynn Lane Wastewater Treatment Plant Disinfection Improvements
Renovation
Results
Broken Arrow, OK 74012

FY'23 Southslope Capital Equipment Replacements
Renovation
Bidding
$139,900 CJ est. value
Tulsa, OK 74107

Adams Creek Basin Study - City of Marianna
Infrastructure
Post-Bid
$1,415,000 CJ est. value
Broken Arrow, OK 74012

Last Updated 03/14/2023 03:09 PM
Project Title

Lynn Lane WWTP Filter Press Replacement Procurement

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74011   (Tulsa County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $610,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes furnishing a belt filter press, cake conveyor, polymer blending unit(s) and the accessories, features, and controls described in the specifications. Supplier shall provide materials, equipment, spare parts, start-up, training, and field-testing services, shop drawing submittals, operations and maintenance (O&M) manuals, and installation certifications. The equipment will be installed by the Contractor for the General Construction Work for the Lynn Lane WWTP Filter Press Replacement project which is to be bid and awarded at a future date. It should be noted that the General Construction Work is funded through a Clean Water State Revolving Fund (CWSRF) loan through the Oklahoma Water Resources Board (OWRB), and therefore subject to all current CWSRF requirements. The Contract for this Work will be assigned by the BAMA to the Contractor for the General Construction Work for the Lynn Lane WWTP Filter Press Replacement project. Upon such assignment, Supplier will function as a subcontractor to the Contractor, and all obligations of this Supplier to the BAMA will become obligations of the Supplier to the Contractor. Example forms for assignment of the Contract and Surety's agreement to the assignment are attached to the Procurement Contract. Project bid documents must be downloaded from QuestCDN which will add your company to the Planholder List and allow access to vBid online bidding for the submittal of your bid (which is required for this project). Bidders will be charged a fee of $30 to submit a bid electronically. FOR THIS PROJECT, BIDS WILL ONLY BE RECEIVED AND ACCEPTED VIA THE ONLINE ELECTRONIC BID SERVICE THROUGH QUESTCDN All required affidavits and Proposal Guarantees MUST be submitted through QuestCDN with bid documents. Only bids submitted as required above by 1:45 p.m. on the date of the bid opening will be considered. Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age, or handicap. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications Sworn statement of the Bidder's assets and liabilities, technical qualifications and performance in the form of the latest annual report and financial statement are not required to be submitted with the Bidder's Proposal, but BAMA may require such statements prior to award of the construction contract. The Statement of Qualifications & Experience using the form found in Section II Proposal Documents, must be submitted with the bid and include, as a minimum, the information required herein. Failure to submit the information required in these documents may result in BAMA considering the Bid non-responsive and result in rejection of the Bid by BAMA. Bidders may be required to provide supplemental information if requested by BAMA to clarify, enhance or supplement the information provided in the Statement of Qualifications & Experience. The apparent successful Bidder shall, within two (2) days after Bid opening, submit to BAMA a list of the Subcontractors, Suppliers, individuals or entities proposed for the Work. Such list shall be accompanied by a Statement of Qualifications & Experience, using the forms found in Section II Proposal Documents, with pertinent information regarding similar projects and other evidence of qualification and experience for each such Subcontractor, Supplier, or other individual or entity. If BAMA or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, BAMA may, before the Notice of Award is given, request apparent successful Bidder to submit an acceptable substitute, within one (1) day of notification. If apparent Successful Bidder declines to make any such substitution, BAMA may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. In such event, the next lowest Bidder shall, within two (2) days after requested by BAMA, submit to BAMA the above required list of the Sub contractors, Suppliers, and other individuals or entities. Bidders must demonstrate, at a minimum, at least three successful belt filter press equipment installations that are similar in nature and scope to this project within the last five years. In evaluating whether a Bidder is responsible, BAMA will consider the qualifications and experience of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided above. Due to social distancing requirements of the COVID-19 health crisis, bidders and other members of the public may attend and view the bid opening only through the following online access by "control clicking" on the link: Virtual bid openings | Broken Arrow, OK . The bid opening will be live-streamed and recorded. The acceptance and award of this Bid will be considered by BAMA. BAMA reserves the right to reject any or all Bids. Project will be awarded to the responsible Bidder with the lowest base bid or lowest combined base and additive alternate bids, if any, which is most advantageous to BAMA. Applicable additive alternates, if any, will be determined at BAMA's discretion. The lowest responsible Bidder will be notified within ten (10) working days of the Bid opening as to when this Public Construction Contract will be placed on the BAMA Agenda for consideration. Each bidder shall accompany his bid with a sworn statement in writing that the bidder has not directly or indirectly entered into an agreement, expressed or implied, with any other bidder concerning the price or amount of such bid or any bids, the limiting of the bids or bidders, the paying to anyone any money for promotion expenses, the parceling or farming out to any bidder or bidders or other persons of any part of the contract or any part of the subject matter of the bid or of the profits thereof. This project is to be financed by a CWSRF loan from the Oklahoma Water Resources Board (OWRB) and shall be referred to as Project No. ORF-21-0028-CW. The following requirements and regulations must be complied with: A. "Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age or physical handicap. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended." B. "Each bidder must fully comply with the requirements, terms and conditions of the Environmental Protection Agency's Disadvantaged Business Enterprise Requirements including employing the six (6) good faith efforts and soliciting disadvantaged business enterprises during the performance of this contract. The bidder commits itself to following the good faith efforts to solicit disadvantaged business enterprises contained herein and all other requirements, terms and conditions of these bid conditions by submitting a properly signed bid. Requirements are contained in OWRB's Guidance and Procedures, ORF-267." C. "Davis Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and sub-contractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code and 29 CFR parts 1,3, and 5. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. For more information, please refer to Oklahoma Water Resources Board Supplemental Conditions, ORF-185 as well as http://www.sam.gov/." D. "American Iron and Steel provisions also apply to projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to P.L. 113-76, Consolidated Appropriations Act, 2014, Sec. 436 requires that "None of the funds made available by a State water pollution control revolving fund as authorized by title VI of the Federal Water Pollution Control Act (33 U.S.C. 1381 et seq.) or made available by a drinking water treatment revolving loan fund as authorized by section 1452 of the Safe Drinking Water Act (42 U.S.C. 300j-12) shall be used for a project for the construction, alteration, maintenance, or repair of a public water system or treatment works unless all of the iron and steel products used in the project are produced in the United States." For more information, please refer to Oklahoma Water Resources Board Supplemental Conditions ORF-185." E. "System for Award Management (SAM) registration is required for all SRF programs (CWSRF and DWSRF) applicants and Awardees (Entities, Prime Contractors, Subcontractors, Vendors) in order to be awarded contracts by the SRF Programs. SAM replaces Central Contractor Registration/Federal Agency Registration, Online Representations and Certifications Application, and Excluded Parties List System. Applicants and awardees are required to complete a one-time free registration to provide basic information relevant to procurement and financial transactions. Registrants must retain an active status to be eligible for SRF projects. New Applicants and Awardees can go to SAM.gov to complete the registration process." Note: In order to register in SAM, a Data Universal Number System (DUNS) number will be required. DUNS number is a unique, non-indicative 9-digit identifier issued and maintained by Dun & Bradstreet (D&B) that verifies the existence of a business entity globally. D&B assigns DUNS numbers for each physical location of a business. All entities doing business with the U.S Government can receive a DUNS number FREE of charge and, under normal circumstances, within 1-2 business days when using D&B web form process.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents