Similar Projects
Last Updated | 10/05/2022 06:35 AM |
Project Title | Hot Mix Asphalt Reconstruction, Concrete Culverts and Pavement Markings on 84th Street |
Physical Address | View project details and contacts |
City, State (County) | Byron Center, MI 49315 (Kent County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,596,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1.01 mi of hot mix asphalt reconstruction, concrete culverts and pavement markings on 84th Street from Hanna Lake Avenue easterly to East Paris Avenue, Kent County. This is a Local Agency project. Control Sec Job No Federal No STU 41000 205531A 22A0656 Net classification required for this project is 1596 Cb or 1596 Ea In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. 2210 009 - Hot Mix Asphalt Reconstruction, Concrete Culverts and Pavement Markings on 84th Street |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |