Similar Projects
Technology Services Equipment
Alteration
Bidding
Holland, MI

Playground Equipment for Cherry Hill and Ford Woods
Post-Bid
Dearborn, MI 48124

Traffic Signal Reflective Backplates
Post-Bid
Clinton Township, MI

Auditorium Rigging and Drapery Improvements Parcells Middle School
Results
Grosse Pointe, Grosse Pointe Woods, MI 48236

E-Rate Network Infrastructure - Equipment
Results
Ann Arbor, MI

Purchase and Installation of Kitchen Equipment
Post-Bid
Midland, MI 48642

Snow Removal Wheel Loader
Results
Alpena, MI

Food Service Kitchen Equipment
Post-Bid
Cedar Springs, MI

Floor Scrubber
Alteration
Results
Livonia, MI

Ludington Area Schools Hs/Ms Complex Pool Equipment
Post-Bid
Ludington, MI

Clamps
Alteration
Results
Flint, MI

Rockford Public Schools Bp 2075-District Workstation Upgrade
Post-Bid
Rockford, MI

Front End Loader With a Snow Pusher - Recycling Center
Alteration
Results
Kent City, MI

JPS Network Refresh 2
Post-Bid
Jackson, MI

One Time Purchase of Led Lamps
Alteration
Results
Clinton Township, MI 48035

Reported 06/11/2022 12:00 AM
Project Title

High School and Middle School Kitchen Cooler Project

Physical Address View project details and contacts
City, State (County) Ida, MI   (Monroe County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For electrical, minor concrete work and new equipment. Ida Public Schools currently has existing cooler and freezer equipment that its replacing with new. Enclosed is a set of drawings with the work to be completed for both schools. Permits are to be pulled from the State of Michigan. The drawings are currently being reviewed by the State. The Owners intent is for the work to be scheduled immediately upon completion of State plan review (estimated in 2-4 weeks). The work must not interrupt student activities in this area. Work must be coordinated with the owner in advance and occur during summer break, on weekends, or scheduled days off, and is anticipated to be completed no later than Friday, August 26th , 2022

Details

Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents