Similar Projects
Pardeeville - Manchester Const/ Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Ripon, WI 54971

Pardeeville - Manchester Const/ Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Ripon, WI 54971

USH 45, City of Fond Du Lac Ex-jt Payment 7 of 11 FY23
Infrastructure
Design
$750,000 to $1,000,000 est. value
Fond du Lac, WI

Summit Automotive Vehicle Service and Repair
New Construction, Infrastructure - 11,485 SF
Design
$2,500,000 CJ est. value
Fond du Lac, WI 54937

Plamore Park
Infrastructure
Bidding
$300,000 CJ est. value
Fond du Lac, WI 54935

Plamore Park
Infrastructure
Bidding
$300,000 CJ est. value
Fond du Lac, WI 54935

Licensed Plumbers/Utility Contractors interested in Participating in the Private Lead Service Line Program
Infrastructure, Alteration
Post-Bid
Ripon, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Single Chip Seal Coat
Infrastructure
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Froedtert Health and ThedaCare
New Construction, Infrastructure - 18,000 SF
Pending Verification
$35,000,000 CJ est. value
Fond du Lac, WI 54935

Pardeeville - Manchester Const/ Structure Replacement
Infrastructure
Conception
$1,000,000 CJ est. value
Ripon, WI 54971

Aurora Medical Center Fond du Lac
Addition, New Construction, Infrastructure - 70,000 SF
Design
$67,000,000 CJ est. value
Fond du Lac, WI 54937

Last Updated 11/17/2022 05:37 AM
Project Title

Fairwater - Brandon, WCL - STH 49

Physical Address View project details and contacts
City, State (County) Ripon, WI 54971   (Fond du Lac County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,469,347 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Proposal ID: 20221011007 Fairwater - Brandon, WCL - STH 49; Fond du Lac County; 6100-08-60; STH 44; 3.618 Miles; Excavation, Base, HMA Pavement, Asphaltic Surface, Curb and Gutter, Sidewalk, Beam Guard, Pavement Marking, Storm Sewer, and Culverts. Estimated Range $1,000,000 - $1,999,999 DBE Goal: NA Contract Completion Time: 35 Working Days With each sealed proposal, the bidder must include a properly executed bid bond or a cashier's check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WisDOT - 07 - Menasha - Appleton, STH 441 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work under this contract shall consist of grading, base aggregate dense, HMA pavement, concrete curb and gutter, concrete sidewalk, guardrail, culverts, landscaping, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents