Similar Projects
Multiple Step Phase II - Purchase of Photovoltaic Array (Pv) for the Regional Operations and Communications Facility
Term Contract
Sub-Bidding
Libertyville, IL 60048

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

Lakefront Environmental Operation and Maintenance Services
Term Contract
Post-Bid
Waukegan, IL

Willow Grove School Asbestos Removal
Infrastructure
Results
Buffalo Grove, IL 60089

2022 Asbestos Abatement
Alteration
Results
Fox Lake, IL 60020

Asbestos Removal at the Elementary School - Woodland Community Consolidated School District 50
Alteration
Post-Bid
$9,000 est. value
Gages Lake, IL 60030

Asbestos Abatement at Grass Lake Elementary School
Alteration
Results
$40,000 est. value
Antioch, IL 60002

Center Line Rumble Strip
Infrastructure
Post-Bid
$200,000 CJ est. value
Waukegan, IL 60085

Forest Park Beach Sand Nourishment
Infrastructure
Results
$258,363 CJ est. value
Lake Forest, IL 60045

Dormant Tree Pruning
Term Contract
Post-Bid
Libertyville, IL 60048

2023 Hourly Grounds Maintenance Contract
Term Contract
Results
$125,913 CJ est. value
Highland Park, IL 60035

Asbestos Abatement at Warren Township High School O'Plaine Campus
Term Contract, Infrastructure
Post-Bid
$25,000 CJ est. value
Gurnee, IL 60031

2022 Demolition Program
Demolition, Infrastructure
Post-Bid
$180,000 CJ est. value
North Chicago, IL 60064

Municipal Water Treatment Chemicals
Term Contract
Post-Bid
Lake Bluff, IL 60044

Refuse Disposal and Recycling Services for All Seven District Schools
Term Contract
Post-Bid
Antioch, IL 60002

Last Updated 07/13/2023 10:12 AM
Project Title

Fitnation Synthetic Turf Installation 2023

Physical Address View project details and contacts
City, State (County) Gurnee, IL 60031   (Lake County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $44,050 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 13, 2023, this project has not yet been awarded. This project will be awarded Tuesday, July 18.** Work to include but not be limited to surface preparation including, removal of existing surfacing which includes turf, rubber flooring and VCT tiling; installation of new Synthetic Turf Resources NGCT synthetic turf with 3-millimeter rubber foam backing as specified, installation of transition threshold, site restoration and all appurtenant construction necessary to complete the project Bid Bond - An amount equal to 10% of the bid price in the form of a bid bond, certified check, or cashier's check made payable to Gurnee Park District shall be submitted with each bid; personal checks will not be accepted. Performance Bond and Labor and Material Bond - The successful bidder shall be required to provide a Performance Bond and Labor and Material Payment Bond for 100% of the awarded contract price within ten (10) days of notification of the contract award Gurnee Park District reserves the right to reject any and all bids and bidders and waive all technicalities

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents