Last Updated | 08/10/2021 02:05 PM |
Project Title | Courthouse Light Court #3 Phase 2 Facade Repair |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53233 (Milwaukee County) |
Category(s) | Single Trades |
Sub-Category(s) | Finishes/Exterior |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | TBE Goal- 25% Part 1 - Removal of existing window systems, disassembling of the existing exterior ductwork as needed for window removal, and structural support of existing exterior ductwork directly penetrating existing window openings on the south elevation of Light Court #3 only. At existing openings, a new window replacement will be installed within the existing opening. After it is in-place the existing ductwork shall be re-assembled and new ductwork supports added and/or repair of existing ductwork supports as detailed. Part - 1 base bid work shall be limited to the south elevation of Light Court #3 Part 2 - Courthouse Limestone Facade Repair – phase 2 encompasses the following base-bid work: Area of Work 1: North Elevation -Replace built-in copper gutter at sixth floor cornice. replace damaged cornice stones at sixth-floor cornice as designated by A/E. Refer to sheet A300. Refer to photo no. 1/A501. Area of Work 2: (Low) Northeast Corner- Rebuild brick and limestone cladding at corner. Refer to details 1 and 5/A301. Area of Work 3: (High) Northeast Corner Cornice- Salvage and reset displaced stones at cornice. Similar to details on sheet A302. Refer to details 6 and 7/A301. Area of Work 4: (Low) Southeast Corner- Rebuild brick and limestone cladding at corner. Refer to detail 2 and 5/A301 Area of Work 5: (High) Southeast Corner Cornice- Salvage and reset displaced stones at cornice. Similar to details on sheet A302. Refer to photo 7/A501. Area of Work 6: Built-in Gutter Replacement- Replace built-in gutter and associated sealants at sixth floor and seventh floor cornices at east elevation. Refer to details 1 and 2/A303. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |