Similar Projects
Jackson Creek Road Improvements
Term Contract
Design

Seal and Cover, Guardrail, Pavement Markings on the Three Forks
Infrastructure
Bidding
MT

Overlay and Chip Seal Bozeman Northeast and Bridger Canyon Road Bozeman Area
Infrastructure
Bidding
Bozeman, MT 59718

Snow Removal (West Yellowstone) FY22-FY26
Term Contract, Infrastructure
Post-Bid
West Yellowstone, MT 59758

Parks & Trails District Snow Removal Services - RFP
Term Contract
Post-Bid
Bozeman, MT

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

Overlay and Chip Seal Lodgepole Road Kalispell Area
Alteration
Bidding

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Hudson Bay Divide South
Infrastructure
Results

Chip Seal E Frontage Road SE Of Dutton Airport Great Falls Area
Infrastructure
Post-Bid
Belgrade, MT 59714

Overlay and Chip Seal Madison Frontage Road and Two Dog Road Bozeman Area
Infrastructure
Results
Silver Star, MT 59751

Region 3 Headquarters Snow Removal
Term Contract
Post-Bid
Bozeman, MT

Overlay and Chip Seal Frontage Rd W of Columbus Billings Area
Infrastructure
Results

Routing and Crack Sealing East River North Bozeman Area
Infrastructure
Post-Bid
Bozeman, MT 59715

Reported 03/10/2022 12:00 AM
Project Title

Scrub Seal Big Sky South Bozeman Area

Physical Address View project details and contacts
City, State (County) Bozeman, MT   (Gallatin County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, roll and broom approximately 166,875 square yards of laid-in-place scrub seal. The quantities include 53.531 square yards of turn lanes and center turn islands. The scrub seal will be approximately 6.9 miles long and 28’ feet wide.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents