Similar Projects
Davisville and Byberry Roads Intersection Improvements
Infrastructure
Bidding
Hatboro, PA

PA63 - PA309 Connector Phase 2, Design Activities Limited to Sound Barrier Walls
Infrastructure
Bidding
$35,000,000 to $39,999,999 est. value
PA

Bituminous Resurfacing Between Milepost 333.99 and Milepost 340.05 and Median Barrier Replacement Between Milepost 337.37 and Milepost 340.03
Post-Bid
PA

Repaving of the Ramp
Post-Bid
Hatboro, PA 19040

Betzwood Park Trail Connection
Results
Norristown, PA 19403

2020 Whitemarsh Township Intersection Improvements Program
Results
Lafayette Hill, PA 19444

High Friction Surface Treatment Services
Post-Bid
Less than $25,000 est. value
Huntingdon Valley, PA

Roadway and Miscellaneous Repairs Between Milepost 299.98 and Milepost 356.42, Between Milepost H-40.83 and Milepost H-43.44 and Between Milepost A-20.00 and Milepost A-31.34
Term Contract
Results

Salem Township Watts and Walker Road Improvements
Post-Bid
Wayne, PA

Roadway and Miscellaneous Repairs Between Milepost A-31.34 and Milepost A-130.64
Results

Coach Mcnelly Stadium - Egress Enhancements
Post-Bid
Royersford, PA 19468

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Lower Road Repair
Alteration
Post-Bid
$250,000 to $500,000 est. value
Wyndmoor, PA

2020 Road Projects
Results
Collegeville, PA 19426

Paving Restoration at Whitemarsh Elementary School, Ridge Park Elementary School and Plymouth Elementary School
Infrastructure
Post-Bid
$560,000 est. value
Lafayette Hill, PA 19444

Last Updated 09/13/2021 10:34 AM
Project Title

2021 Road Improvements Project

Physical Address View project details and contacts
City, State (County) Eagleville, PA   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

VanBuren Avenue (Rittenhouse Road/Trooper Road) Traffic Control(1 LS), Leveling Course-As Directed(180 Tons), 1½” Milling(3,900 SY), 1½” Wearing Course(9,015 SY), Base Repair-Where Required(400 SY); Redtail Road (Eagleville Road/Highley Road) Traffic Control(1 LS),Leveling Course-As Directed(100 Tons),1½” Milling(6,580 SY), 1½” Wearing Course(6,580 SY);Lauman Avenue(Belmont-Woodland Road) Traffic Control(1 LS), Leveling Course-As Directed(90 Tons), 1 ½” Milling(4,930 SY), 1½” Wearing Course(4,930 SY); Second Street(Off Barry Avenue) Traffic Control(1 LS), Leveling Course-As Directed(10 Tons), 1 ½” Milling(700 SY), 1½” Wearing Course(700 SY), Storm Sewer Adjustments(Twp to supply tops & brick where required), Remove and Replace “C” Top(1 EA), Remove and Replace “M” Top(1 EA); Manhole Casting Adjustments(Adj. will be determined in the field by sewer authority, if req’d), 0”-3”(1 EA), 3”-12”(1 EA),Wrap and Seal Manholes Only(1 EA). Alternate Bid A includes: Glenwood Avenue(Park Avenue/Vine Street) Traffic Control(1 LS), Leveling Course-As Directed(50 Tons), 1½” Milling(2,650 SY), 1½” Wearing Course(2,650 SY); Hollywood Road(Park Avenue/Vine Street) Traffic Control(1 LS), Leveling Course-As Directed(40 Tons), 1½” Milling(1,800 SY), 1½” Wearing Course (1,800 SY), Vine Street(Hollywood Avenue/Glenwood Avenue) , Traffic Control(1 LS), Leveling Course-As Directed(20 Tons),1½” Milling(1,050 SY), 1½” Wearing Course(1,050 SY);Storm Sewer Adjustments(Twp to supply tops & brick where required Remove and Replace C Top(1 EA), Remove and Replace M Top(1 EA); Manhole Casting Adjustments(Adj. will be determined in the field by sewer authority, if req’d), 0”-3”(1 EA), 3”-12”(1 EA), Wrap and Seal Manholes Only(1 EA). Alternate Bid B includes: Doris Lane(Off Vincent Drive) Traffic Control(1 LS), Leveling Course-As Directed(20 Tons), 1 ½” Milling(1,300 SY), 1 ½” Wearing Course(1,300 SY);Janet Lane(Off Vincent Drive) Traffic Control(1 LS), Leveling Course-As Directed(20 Tons), 1½” Milling(1,300 SY), 1½” Wearing Course(1,300 SY); Lillian Court(Off Vincent Drive) Traffic Control(1 LS), Leveling Course-As Directed(20 Tons),1 ½” Milling(1,600 SY), 1 ½” Wearing Course(1,600 SY); Coutler Court(Off Vincent Drive) Traffic Control(1 LS), Leveling Course-As Directed(20 Tons), 1½” Milling(1,300 SY), 1½” Wearing Course(1,300 SY); Edwards Lane(Off Vincent Drive), Traffic Control(1 LS), Leveling Course-As Directed(20 Tons), 1½” Milling(1,300 SY), 1 ½” Wearing Course(1,300 SY); Storm Sewer Adjustments(Twp to supply tops & brick where required Remove and Replace C Top(1 EA), Remove and Replace M Top(1 EA); Manhole Casting Adjustment(Adj. will be determined in the field by sewer authority, if req’d), s 0”-3”(1 EA), 3”-12”(1 EA),Wrap and Seal Manholes Only(1 EA).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents