Similar Projects
Project Luna / 1111 Akron Way
New Construction, Infrastructure - 278,212 SF
Design
$33,000,000 CJ est. value
Forney, TX 75126

Forney Marketplace - Lot 8
New Construction, Infrastructure - 8,400 SF
Design
$1,848,000 est. value
Forney, TX 75126

Kingsborough East Wastewater Treatment Facility Phase 1 - Lease
New Construction, Infrastructure
Bidding
$9,950,650 CJ est. value
Crandall, TX 75114

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2019-2020 TxCDBG Drainage Improvements
Infrastructure
Results
$171,605 CJ est. value
Kemp, TX 75143

2019-2020 TxCDBG Drainage Improvements
Infrastructure
Results
$171,605 CJ est. value
Kemp, TX 75143

High Point Special Utility District New Headquarters
New Construction, Infrastructure - 5,364 SF
Construction
$3,000,000 CJ est. value
Forney, TX 75126

High Point Special Utility District New Headquarters
New Construction, Infrastructure - 5,364 SF
Construction
$3,000,000 CJ est. value
Forney, TX 75126

ClearWater Express Car Wash / Terrell
New Construction, Infrastructure - 6,725 SF
Pending Verification
$2,000,000 CJ est. value
Terrell, TX 75160

ClearWater Express Car Wash / Terrell
New Construction, Infrastructure - 6,725 SF
Pending Verification
$2,000,000 CJ est. value
Terrell, TX 75160

South Pointe Park at Kaufman Sports Village Addition
New Construction, Infrastructure - 147,100 SF
Design
$130,000,000 CJ est. value
Kaufman, TX 75142

Grading Improvements for Las Lomas Phase 2
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Kaufman, TX 75142

Walden Pond West Phase 1 Grading Improvements
Infrastructure
Results
$1,152,730 CJ est. value
Kaufman, TX 75142

Lions Den Self Storage Phase 2
New Construction, Infrastructure - 23,200 SF
Construction
$696,000 CJ est. value
Kaufman, TX 75142

Last Updated 10/10/2023 09:33 AM
Project Title

Construction of Both the Utility Improvements for Kingsborough, Phase 1B and the Paving Improvements

Physical Address View project details and contacts
City, State (County) Kaufman, TX 75142   (Kaufman County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The contractors can bid on both contracts, but it is not required. Separate bid proposals shall be submitted for each project. Contracts will be awarded separately. Electronic bids do not include bids submitted by telegraphic or facsimile transmission .Bid security in the form of bid bond or cashier's check payable to LGI Homes - Texas, LLC. on behalf of Kaufman County Fresh Water Supply District No. 7A in an amount not less than five percent (5%) of the Bid submitted, must accompany each Bid. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and/or Contract and bidder/contractor agrees that the Contract can be terminated if the bidder/contractor knowingly or intentionally fails to comply with a requirement of that subchapter. Bidder/Contractor declares that it has not received from a governmental body a notice of noncompliance with a provision of Subchapter J, Chapter 552, Texas Government Code, or, if such notice has been received, bidder/contractor has taken adequate steps to ensure future compliance with such subchapter and has provided or upon request will provide documentation of same. Each Bid must be accompanied by Bid security made payable to OWNER in an amount of no less than five percent (5%) of the Bidder's maximum Bid price and in the form of certified or cashier's check or bid bond as specified in the Invitation to Bidders. The surety company providing the Bid Bond must conform to the same requirements for surety companies providing Performance and Payment Bonds as described in the Special Conditions. If a cashier's check is furnished, it is to be drawn on a bank in the county where the Project is located or counties bordering that county. The security is a guarantee that the successful Bidder will enter into the Contract and execute the required payment and performance and maintenance bonds. It is anticipated that the Notice to Proceed will be issued in November 2023.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents