Similar Projects
Last Updated | 12/07/2022 11:47 AM |
Project Title | Wastewater Compliance and Lift Station Maintenance Facility |
Physical Address | View project details and contacts |
City, State (County) | Columbia, SC 29201 (Richland County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2019 |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Question Cutoff Date: 5/9/2019 10:00:00 AM (ET) Detailed instructions for submitting responses to this Request for Qualifications can be found under Section VI. Mandatory Response Requirements and Submittal Format. The city is seeking an A/E firm(s) with the ability to complete pre-design, design, construction documents including required engineering, bidding, permitting and construction administration services for a new 7,600 SF Wastewater Compliance and Lift Station Maintenance Facility with an attached 5,000 SF workshop/warehouse. The new facility will be located directly across from the existing MWWT Administration/Laboratory Building located at 1200 Simmon Tree Lane, Columbia, SC 29201. The proposed site for the facility is located at the corner of Metro Lane and Simmon Tree Lane, has Tax Map Sequence (TMS#) 11000-01-11, and is approximately 32 acres. This project also includes a large covered storage shed for City equipment with proper egress to allow for tractor trailer access located within the plant site beside the Equalization (EQ) basin. The following provides a general idea of the type of services the City desires for this project As of April 18, 2019, The method of contractor selection has not been determined at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |