Similar Projects
I-59 Widening
Infrastructure
Conception
Less than $50,000,000 est. value
Trussville, AL 35173

Bell Hill Road Widening- County of Jefferson
Infrastructure
Conception
$6,000,000 to $8,000,000 est. value
Bessemer, AL 35021

The Star Uptown / Carraway Hospital Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Design
$300,000,000 CJ est. value
Birmingham, AL 35234

The Star Uptown / Carraway Hospital Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Design
$300,000,000 CJ est. value
Birmingham, AL 35234

BX Birmingham Xpress, Bus Rapid Transt (BRT) - Transit Stations
New Construction
Post-Bid
Birmingham, AL 35208

Installation of Water Mains and Appurtenances
Post-Bid
Birmingham, AL 35232

County Road 7 Roadway Failure Repair
Results
$559,865 est. value
Birmingham, Oneonta, AL 35244

7th Ave South - Streetscape Project
Results
$720,613 est. value
Birmingham, AL 35200

Samford University Recreation Center and Athletic Complex
New Construction, Infrastructure - 154,000 SF
Pending Verification
$30,000,000 CJ est. value
Birmingham, AL 35229

Southern Research Biotech Building
Demolition, New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Birmingham, AL 35203

Installation of Water Mains and Appurtenance
Post-Bid
Birmingham, AL 35232

Constructing Pavement Rehabilitation and Guardrail Safety Improvements (Planing, Resurfacing, Guardrail Installation, and Traffic Stripe)
Results
$4,273,048 to $5,222,615 est. value
Fultondale, AL 35068

The Tracks
New Construction, Infrastructure
Design
$41,000,000 CJ est. value
Birmingham, AL 35233

Meadow Court / Avenue "Q" Ensley
Post-Bid
Birmingham, AL 35232

Constructing Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe
Results
$1,490,261 to $1,821,430 est. value
Trussville, AL

Last Updated 09/23/2022 04:10 AM
Project Title

Safety Improvements (Curb and Gutter Installation, Drainage Improvements, and Sidewalk Installation) on CR-1142 (Chapel Road)

Physical Address View project details and contacts
City, State (County) Hoover, AL 35226   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $1,940,416 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Jefferson Constructing the Safety Improvements (Curb and Gutter Installation, Drainage Improvements, and Sidewalk Installation) on CR-1142 (Chapel Road) from the intersection of Park Avenue to the junction of Stone Brook Parkway in Hoover. Length 1.150 mi. The Bracket Estimate on this project is from $1,601,142 to $1,956,951. Contract Time: 115 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 001 - Safety Improvements (Curb and Gutter Installation, Drainage Improvements, and Sidewalk Installation) on CR-1142 (Chapel Road) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents