Similar Projects
Coronado Island Marine Village
New Construction
Conception
New Smyrna Beach, FL 32169

Winter Springs Self-Storage
New Construction - 70,675 SF
Conception
Winter Springs, FL 32708

HCDC Industrial Park
New Construction
Design
Bonifay, FL

Beacon Park - Master Plan
New Construction - 640,000 SF
Design
$10,000,000 CJ est. value
Jupiter, FL 33458

Margate Self Storage
New Construction - 133,872 SF
Post-Bid
$8,352,943 est. value
Margate, FL 33063

Cubesmart and Retail
New Construction, Build-Out - 115,859 SF
Post-Bid
$7,414,425 est. value
Pompano Beach, FL 33060

John E. Preston Water Treatment Bulk Sodium Storage Facility
Results
$2,666,249 est. value
Hialeah, FL 33010

Pole Barn
Results
Less than $75,000 est. value
Callaway, Panama City, FL 32404

Holley-Navarre WWTF Clarifier #4
New Construction, Demolition - 9,000 SF
Construction
$1,324,867 est. value
Navarre, FL 32566

Parrish Storage 2
New Construction - 64,800 SF
Construction
$4,000,000 est. value
Parrish, FL 34219

Crews Commerce Center Industrial Park - Phase II
New Construction - 1,290,240 SF
Design
$27,900,000 est. value
Orlando, FL 32824

Extra Space Storage
New Construction - 51,298 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Miami, FL 33173

Purchasing Warehouse Pipe Storage Facility
Results
$180,000 est. value
Kissimmee, FL

Compass Self Storage
New Construction, Build-Out - 162,280 SF
Construction
$13,576,738 est. value
Jupiter, FL 33458

Safe and Secure Storage
New Construction - 110,000 SF
Design
$10,000,000 CJ est. value
Coral Springs, FL 33065

Last Updated 07/17/2019 12:02 PM
Project Title

CP Performance

Physical Address View project details and contacts
City, State (County) Palm Coast, FL 32137   (Flagler County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Bids by Invitation.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details 1 Warehouse/Storage, 1 Story Above Grade, 20,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents