Similar Projects
Last Updated | 12/31/2020 05:08 PM |
Project Title | HVAC R-22 Refrigerant Replacement Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Denver, CO (Denver County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This is a design/build project and pricing shall be based on performing engineering and construction services to demolish and construct the replacement of equipment containing refrigerants phased out by the Environmental Protection Agency. Under previous projects, Equipment using R-22 as a refrigerant were replaced in the Central Utility Plant (CUP), Airport Office Building (AOB) and Concourse A (CCA). This project is for the replacement of units containing R-22 in the Main Terminal (TML), Concourse B (CCB), Concourse C (CCC), all Airside Buildings (i.e., Antenna Farm, De-ice, ARFF, OPS Office, Lighting Vaults, Snow Trailer, etc.), Pena and Air Cargo areas and the South Campus. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |