Similar Projects
Additions and Renovations to Fairfield High Preparatory School
Renovation, Addition
Bidding
Fairfield, AL

Phenix City Intermediate School Band Room and Classroom Addition
Addition
Bidding
Phenix City, AL 36867

Cullman High School Gym Renovation
Renovation
Post-Bid
Cullman, AL 35055

Hitting Facility
New Construction
Post-Bid
Less than $350,000 est. value
Enterprise, AL

New Weight Room Building for Chelsea High School
New Construction
Results
Chelsea, AL 35043

New Hueytown Intermediate School
New Construction - 92,000 SF
Results
Less than $16,879,000 est. value
Hueytown, AL

Classroom and Fine Arts Addition for Hewitt-Trussville Middle School
Addition - 24,000 SF
Construction
Trussville, AL

Fairhope K-6 School Addition
Addition
Construction
Robertsdale, AL

Central High School - Synthetic Field for Physical Education, JROTC Drill and Soccer Activities
Bidding
Phenix City, AL 36870

A New Classroom Building for the Helen Keller School Campus
New Construction
Post-Bid
Talladega, AL 35160

Additions and Renovations to Sparkman Middle School
Renovation, Addition
Results
Less than $2,213,000 est. value
Toney, AL

Oakwood Adventist Academy - New High School Building
New Construction - 19,742 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Huntsville, AL 35896

Bob Jones High School Special Education Addition
Addition
Bidding
Madison, AL 35758

Visitor Bleacher Replacement At Brewer Hs Football Stadium
Post-Bid
Somerville, AL

Renovations to Hueytown Middle School
Renovation
Results
Less than $11,000,000 est. value
Hueytown, AL 35023

Reported 05/17/2021 12:43 PM
Project Title

Addition to Existing Athletics for Hartselle High School

Physical Address View project details and contacts
City, State (County) Hartselle, AL 35640   (Morgan County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) Athletic Facility, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents