Similar Projects
Miro Corners Parking
New Construction
Conception
$665,468 est. value
Hollywood, FL 33314

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Post-Bid
Less than $1,158,847 est. value
Jacksonville, FL 32099

Construct North 7th Street Sidewalk
Term Contract
Post-Bid
Lantana, FL 33462

SW 27th Multi-Use Path
Results
Less than $367,000 est. value
Gainesville, FL

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Salt Lake (Entry Improvements)
Post-Bid
Less than $75,000 est. value
Mims, FL 32754

City of Freeport - Pool Parking Lot Paving
Results
Less than $39,266 est. value
Freeport, FL

City of Plant City Sidewalk Improvements
Post-Bid
Plant City, FL 33564

Concrete Horizontal Cutting on Public Walking Surfaces - ADA Compliance
Results
Less than $100,000 est. value
Tampa, FL 33601

Osceola Technical College (TECO) Parking Lot Expansion
Post-Bid
Kissimmee, FL 34744

Sidewalk Restoration Services
Term Contract
Results
Miramar, FL

Sidewalk Replacement at Public Housing Property
Post-Bid
Eustis, FL 32726

Six Mile Cypress Shared use Path from Winkler Avenue to Challenger Boulevard
Results
Less than $145,666 est. value
Fort Myers, FL 33901

Widen/Resurface Exist Lanes/Sidewalk/Bicycle Lanes
Post-Bid
Less than $1,378,994 est. value
FL

Last Updated 11/12/2019 01:34 PM
Project Title

James Lee Park Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Crestview, FL   (Okaloosa County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $400,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project Base Bid includes the expansion of the existing parking lot by approximately 7` and then mill and overlaying the proposed parking spaces to convert the parking on the north side of the lot from parallel parking to 45 degree parking and will be performed in two phases. The Additive Bid Alternate adds the mill and overlay of the remaining parking lot and the restriping of the entire parking lot. The scope includes full marking and landscape improvements.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents