Similar Projects
5100 Reidsville Road
New Construction - 5,600 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Walkertown, NC 27051

Love's Travel Stop
New Construction - 25,550 SF
Conception
$10,000,000 CJ est. value
Rural Hall, NC 27045

Albert Lee Building
New Construction - 5,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Wilmington, NC

First Quality Imports
New Construction - 6,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Wilmington, NC 28405

P1394 Phase B - Boat and Vehicle Maintenance and Storage Facilities, Marine Corps Base, Camp Lejeune
New Construction - 38,000 SF
Post-Bid
$10,000,000 to $25,000,000 est. value
Camp Lejeune, NC

Take 5
New Construction - 1,069 SF
Post-Bid
Less than $500,000 CJ est. value
Salisbury, NC 28144

Speed Auto
Renovation
Construction
Charlotte, NC 28227

Mazda
New Construction, Renovation - 24,415 SF
Construction
$3,000,000 est. value
Wilmington, NC 28405

Fields Mazda
New Construction - 11,697 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Asheville, NC 28806

Take 5 Express Car Wash and Oil Change
New Construction
Conception
Charlotte, NC 28213

Action Water Sports
New Construction - 10,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Cornelius, NC 28031

Army Reserve Center, Vehicle Maintenance Shop, and an Unheated Storage Building
New Construction - 37,405 SF
Post-Bid
$10,000,000 to $25,000,000 est. value
Asheville, NC

Valvoline Instant Oil Change
New Construction - 3,485 SF
Construction
$500,000 to $1,000,000 CJ est. value
Waxhaw, NC 28173

Strickland Brothers 10 Minute Oil Change / Statesville
New Construction
Conception
Statesville, NC 28625

University City Entertainment District Phase II
New Construction - 28,000 SF
Design
$10,000,000 CJ est. value
Charlotte, NC 28262

Reported 07/14/2022 02:39 PM
Project Title

Vehicle Wash Facility - EN-20-012 - City of Jacksonville

Physical Address View project details and contacts
City, State (County) Jacksonville, NC 28540   (Onslow County)
Category(s) Commercial
Sub-Category(s) Vehicle Sales/Service
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $550,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new fully automated vehicle wash facility at the Public Services Complex. As of July 13, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Vehicle Sales/Service, New Construction.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents