Similar Projects
Lead Service Replacements
Infrastructure
Design
$600,000 CJ est. value
Billings, MT 59101

Schedules 1-4, Water and Sewer Main Replacement
Infrastructure
Post-Bid
Billings, MT

Northwest Billings Connector and Marathon Loop - Highway 3 Skyline Trail Phase II (Build Grant #DTOS59-20-RA-BUILD) - Schedule II
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Billings, MT 59106

Underpass Ave - Billings
Infrastructure
Results
$9,975,733 CJ est. value
Billings, MT 59101

Northwest Billings Connector and Marathon Loop - Inner Belt Loop Phase II (Build Grant #DTOS59-20-RA-BUILD) - Schedule I
Infrastructure
Results
$13,983,760 CJ est. value
Billings, MT 59105

Water Main Extension - Grey Eagle Ditch to Arlington Avenue
Infrastructure
Post-Bid
$125,000 CJ est. value
Billings, MT 59101

2023 Billings Water Main Replacement
Infrastructure
Results
$3,437,189 CJ est. value
Billings, MT 59101

Mullowney Lane Improvements
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Billings, MT 59101

2023 Sewer Main Replacement - Contract 2
Infrastructure
Results
$3,314,566 CJ est. value
Billings, MT 59101

MetraPark Lower and Expo Lot Project
Infrastructure
Post-Bid
$100,000 CJ est. value
Billings, MT 59101

WO 23-43 Water Service Repairs
Infrastructure
Results
$65,645 CJ est. value
Billings, MT 59101

Cypress Point
Infrastructure
Post-Bid
$988,248 CJ est. value
Billings, MT 59101

CCTV City Storm Drain
Infrastructure
Results
$157,160 CJ est. value
Billings, MT 59101

Grandview Park Irrigation System Replacement
Infrastructure
Post-Bid
$55,000 CJ est. value
Billings, MT 59101

Landfill Slope Stability Improvements
Infrastructure
Post-Bid
$530,000 CJ est. value
Billings, MT 59101

Last Updated 07/25/2023 02:53 PM
Project Title

Monad Sewer Extension

Physical Address View project details and contacts
City, State (County) Billings, MT 59101   (Yellowstone County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $6,499,446 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of: Construction of a new, large-diameter sanitary sewer trunk line. Improvements include sanitary sewer main installation, pedestrian trail installation and gravel access road installation. The project is located along the Monad Drain Corridor west of Shiloh Road, S. 48th St. W. and King Ave. W. in Billings, Montana. CONTRACTOR and any of the CONTRACTOR'S subcontractors bidding or doing work on this project will be required to be registered with the Montana Department of Labor and Industry (DLI). Forms for registration are available from the Department of Labor and Industry, P.O. Box 8011, 1805 Prospect, Helena, Montana 59604-8011. Information on registration can be obtained by calling 1-406-444-7734. All laborers and mechanics employed by CONTRACTOR or subcontractors in performance of the construction work shall be paid wages at rates as may be required by the laws of Yellowstone County and the state of Montana. The CONTRACTOR must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to the "City of Billings, MT" in an amount not less than ten percent (10%) of the total amount of the bid. Successful BIDDERS shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance as required shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. Bids submitted via email shall have the bid bond scanned and included with the bid. Bids submitted via mail shall or hand delivered shall have any of the bid securities included. For further information concerning this project, please contact Taylor Kasperick, project manager with Performance Engineering by telephone at (406) 384-0080 or by email at taylor@performance-ec.com or contact Sarah Plath at the Office of the City Engineer, 2224 Montana Ave., Billings, MT 59101, by telephone at (406) 657-8242 or by email at plaths@billingsmt.gov. he right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period of not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid which is in the best interest of the OWNER. OWNER may award any combination of Bid Schedules, Bid Items, and/or Bid Alternatives that are in the best interest of the OWNER. The project will only be awarded to one BIDDDER. The City of Billings is an Equal Opportunity Employer. Bid Result. Schedule 1:COP Construction $1,868,105.50 Schedule 2:COP Construction $446,875.50 Schedule 3A:Western Municipal Construction $1,288,221.30 Schedule 3B-1:Western Municipal Construction $372,560.30 Schedule 3B-2:COP Construction $964,242.00 Schedule 4:COP Construction $1,070,451.00 Schedule 5:Western Municipal Construction $488,900.10

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents