Similar Projects
Design-Build Services for Flood Mitigation at Twenty-Six Substations
Infrastructure
Bidding
$50,000,000 to $100,000,000 est. value
Brooklyn, Manhattan, NY

Design-Build Services for Flood Mitigation at Twenty-Six Substations
Infrastructure
Bidding
$50,000,000 to $100,000,000 est. value
Brooklyn, Manhattan, NY

Rehabilitation of Large Culverts LC058-20 and LC154-20 on Summit Road CR 58 and Newport Road CR 154
Post-Bid
Less than $600,000 est. value
Newport, Schuyler, NY

Lakewood Precision Swale Stormwater Retrofits
Post-Bid
Lakewood, NY 14750

Culvert Replacement Project CR23 (Brook Road) Over Slade Creek, Saratoga Springs
Results
Ballston Spa, NY 12020

Culvert Replacement Project - Hulbert Hollow Road over a Tributary low Road over a Tributary to Michigan Creek
Results
Spencer, NY 14883

Scour Repair and Channel Cleaning, i-86 and Ny Routes: 13, 228, 230, 243, 248, 275 and 417.
Infrastructure
Bidding
$600,000 est. value

Construction of a Bulkhead 2
Post-Bid
Port Chester, NY 10573

Rehabilitation of East Circle Drive Over Darlene`s Brook
Results
Cicero, NY 13039

Pavement Rehabilitation and Culvert Replacement
Infrastructure
Bidding
$4,500,000 est. value
NY

Shore Road Waterfront Park Natural Systems Resiliency Improvements
Post-Bid
Lindenhurst, NY 11757

Webster Avenue Drainage Improvements - Washington Avenue to Lockwood Avenue
Results
New Rochelle, NY 10801

North Shore Towers Courtyard Project
Renovation
Bidding
Binghamton, NY 13901

West Pointe Marina Seawall (REDI MO 18)
Post-Bid
Rochester, NY 14612

Removal and Installation of New Retaining Walls
Results
$25,000 to $100,000 est. value
Balmville, NY 12550

Last Updated 01/28/2022 09:18 AM
Project Title

Deerfield Tank Slope Stabilization Improvements

Physical Address View project details and contacts
City, State (County) NY   (Oneida County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes site work for slope stabilization and stormwater management facilities to repair erosion at the Deerfield Water Storage Tank.

Details

Division 31 - Earthwork, Grading, Finish Grading, Spreading and Grading Topsoil, Excavation and Fill, Trenching and Backfilling, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Turf and Grasses, Seeding.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents