Similar Projects
Community Room Roof Replacement
Alteration
Bidding
Shushan, NY 12873

Sol Cher Apartments Roof Replacement
Alteration
Bidding
Long Beach, NY 11561

District Wide Roof Repairs
Post-Bid
Scarsdale, NY 10583

Baker Lab Roof Replacement
Renovation
Post-Bid
$200,000 to $230,000 est. value
Ithaca, NY 14882

Building Roof Replacement at the Pawling (PWL) VOR
Results
$20,000 to $40,000 est. value
Dover Plains, NY 12522

Roundhouse Roof Replacement at Whiteface Mountain
Results
Lake Placid, NY 12946

Roof Replacement Building 2 at the Saratoga County WWTP
Alteration
Bidding
Mechanicville, NY 12118

Roof Repairs
Term Contract
Post-Bid
Rochester, NY 14609

Replace Roofs at Charlton and STUAC, Buildings 45 and 08 at at College of Agriculture and Technology at SUNY Morrisville
Results
$2,500,000 to $5,000,000 est. value
Morrisville, NY 13408

Kensington Water Tower Roof Replacement
Alteration
Bidding
$120,000 to $150,000 est. value
Buffalo, NY

Roof Repair Services
Term Contract
Post-Bid
Greece, NY 14515

Re-Roofing of the Salt Storage Shed
Results
Germantown, NY 12526

Baruch College IT Roof Replacement
Alteration
Bidding
New York, NY 10010

Roof Repair/ Replacement
Post-Bid
Narrowsburg, NY 12764

Batavia CSD Robert Morris Roof Replacement
Results
Batavia, NY 14020

Last Updated 09/21/2021 08:55 AM
Project Title

104 Cobblestone IRA Roof Replacement

Physical Address View project details and contacts
City, State (County) Newark, NY 14513   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the entire Roof System over Residence. SCOPE OF WORK includes, but is not necessarily limited to the following: 1.Remove the existing asphalt shingle roofing system complete down to the existing wood decking. Any damaged decking will be quoted and result in a change order. 2.Provide and install a new 30-year asphalt shingle roofing system complete, including all flashings, underlayment’s, ice barriers, venting, accessories, and other roofing materials as required for a complete system. 3.Remove and replace exhaust vent covers as per existing, typical. 4.Remove and replace drip edge at all eaves and gables, typical. 5.Flash all penetrations, typical. 6.Remove and replace ridge vents on all ridges, typical. 7.No asbestos-containing materials may be used.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents