Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

WAPA Facilities / Small Construction IDIQ
Post-Bid

Open Air Structures and Accessory or Utility Buildings with Related Equipment and Services
Post-Bid

ADA Improvements
Results
Minneapolis, MN 55408

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Results
$250,000 to $5,000,000 est. value

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

CDBG 2021 - Consolidated Pool
Results
MN

Facility Assesment and Planning with Related Services
Term Contract
Post-Bid

Washburn Crosby A Mill Complex Ruins Preservation 2021
Renovation
Results
MN 55401

Secure Construction SATOC
Post-Bid
$100,000,000 est. value
Washington, DC

USPS IQ JOC Minnesota
Renovation
Results

C1dz--618-20-111, Renovate Bldg 223 for Pandemic Storage Design-Build
Renovation
Post-Bid
Minneapolis, MN

Medina Welding Expansion
Renovation, Addition
Results
$644,180 est. value
Medina, MN 55340

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Last Updated 10/22/2021 08:49 AM
Project Title

New Hope Public Works Facility Phase 1 Improvements

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55428   (Hennepin County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method
Project Status Construction Commenced June 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project will consist of renovations to the New Hope Public Works Facility, new Soils Storage Building, replacement of the north half of the existing outdoor storage area pavement, expanded parking at the northwest corner of the site, and new vertical pivot security gates. Alternates will include refurbishing cabinets in the Lunch Room and Kitchen, new vinyl flooring throughout the front of house spaces, translucent wall panels, and new upward acting sectional doors

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents