Similar Projects
Replacement of Bridge No. 150 - Camp Wawa Road Bridge over Perkiomen Creek
Bidding
Schwenksville, PA 19473

Bridge Barrier And Guide Rail Replacement At Hudnut Road Bridge No. 1
Post-Bid
Skippack, PA 19474

Limekiln Pike Aluminum Pedestrian Bridge Pre-Fabrication
Results
Fort Washington, PA 19034

SR 422: PM1 to MP 180 - D/B Activities Limited to Traffic Control
Results
$15,000,000 to $19,999,999 est. value
PA

Structure Removal
Results
$100,000 to $500,000 est. value
PA

Upper Merion Bridge Repair Project
Results
$105,000 to $120,000 est. value
King of Prussia, PA 19406

Moore Road Bridge Repair
Results
$150,000 to $200,000 est. value
King of Prussia, PA 19406

2019 Bridge Maintenance Program
Results
Less than $95,000 est. value
PA

Bridge Rehab Group W
Results
$2,500,000 to $4,999,999 est. value

Indian Creek Road (T-431) Bridge Rehabilitation Project
Results
$500,000 to $550,000 est. value
Harleysville, PA 19438

D6 Bridge Cleaning 2019
Results
$500,000 to $999,999 est. value

Timber Bridges - Deck Replacement Project
Results
Less than $75,000 est. value
Worcester, PA

Tookany Creek Carter Lane Bridge Beam Replacement
Results
Elkins Park, PA

2019 Collegeville Road Pedestrian Walking Bridge
Results
$110,000 est. value
Skippack, PA 19474

Bridge Repairs
Term Contract
Results

Last Updated 08/21/2019 05:50 AM
Project Title

Rehabilitation of Bridge No. 59 - West Valley Green Road Over Wissahickon Creek

Physical Address View project details and contacts
City, State (County) PA   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This project consists of but is not limited to the rehabilitation of the West Valley Green Road Bridge over Wissahickon Creek and related items. In accordance with this contract, the work will include: Truss member replacement along bottom chord. Truss member repair at vertical members. Stringer and deck replacement at end panels of each span. Weld floorbeam bottom flange coverplates. Reconstruct beam seats at abutments and piers. Construct concrete end diaphragms and backwalls at each abutment. Construct concrete end diaphragms at each pier. Construct headache bars at each roadway approach.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents