Similar Projects
Groff Park CPA - Town of Amherst
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Amherst, MA 01002

Mill River Playground - Town of Amherst
Infrastructure
Conception
$400,000 CJ est. value
Amherst, MA 01002

Volvo Auto Sales Development / Northampton
Renovation, Infrastructure
Design
$500,000 CJ est. value
Northampton, MA 01060

King Street Active Adult Living Facility
New Construction, Infrastructure - 110,000 SF
Design
$26,500,000 CJ est. value
Northampton, MA 01060

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Snow Plowing of School and Municipal Lots FY22
Term Contract
Post-Bid
Easthampton, MA

Statewide Pavement Maintenance at General Aviation Airports in the Commonwealth Including Crack Sealing, Crack Repair, Pavement Repair
Infrastructure
Post-Bid
$3,500,000 est. value

Smith Academy Park Improvements Phase II Pavilion Project Re-Bid
Infrastructure
Results
$356,750 CJ est. value
Hatfield, MA 01038

Roadway Reconstruction and Related Work (Including Signals) on a Section of Russell Street (Route 9)
Infrastructure
Results
$22,337,464 est. value
Hadley, MA 01035

Hockanum Fence Replacement
Infrastructure
Construction
$87,500 CJ est. value
Hadley, MA 01035

Removal of Oil Tank at Amherst Regional Middle School
Infrastructure
Construction
$70,975 CJ est. value
Amherst, MA 01002

East Pleasant Mixed-Use Development
New Construction, Infrastructure - 1,300 SF
Pending Verification
$1,500,000 CJ est. value
Amherst, MA 01002

East Pleasant Mixed-Use Development
New Construction, Infrastructure - 1,300 SF
Pending Verification
$1,500,000 CJ est. value
Amherst, MA 01002

War Memorial Playground - Town of Amherst
Infrastructure
Conception
$350,000 CJ est. value
Amherst, MA 01002

Parking Lot 65 Holdsworth
Infrastructure
Post-Bid
$277,000 est. value
Amherst, MA

Last Updated 02/28/2023 07:41 AM
Project Title

RFP Engineering - Design Extension of Rocky Hill Greenway

Physical Address View project details and contacts
City, State (County) Northampton, MA 01060   (Hampshire County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Design extension of Rocky Hill Greenway shared use path to fill a gap between the current path at Florence Road and the next section of the path at Burts Pit Road, Northampton, approximately 1.1 miles. Design to full PS&E and right-of-way plans meeting all MassDOT design standards and requirements The method of Contractor Selection has not been Determined at this time.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents