Similar Projects
Lakeside At Trappe Master Plan
New Construction
Design
Trappe, MD

WRTP Launder Cover Design
Bidding
Chesapeake Beach, MD 20732

Stevensville Water Treatment Plant
New Construction
Bidding by Invitation
Stevensville, MD 21666

Water Treatment Program
Post-Bid
Princess Anne, MD 21853

Solids Screening at Four Water Resource Recovery Facilities Project
Post-Bid
Damascus, MD

Fair Hill Water System Upgrade
Renovation
Results
Elkton, MD

Water Treatment Services
Term Contract
Results
$13,530 est. value
Kensington, MD 20895

Repair of Steam Sterilization Plant, Fort Detrick, MD
Post-Bid
$25,000,000 to $100,000,000 est. value
Fort Detrick, MD

Fruitland Water System Upgrade - Supply Well and Water Treatment Plant
Results
Fruitland, MD 21826

Patuxent Water Filtration Plant Centrifuge Control Room
Post-Bid
Laurel, MD 20707

Water Treatment Services – Maintenance, Repair and Installation
Results
Annapolis, MD 21401

Water Treatment Service Contract
Post-Bid
College Park, MD 20742

Charlotte Hall Veteran's Home Wastewater Treatment Plant Upgrade Phase II Saint Mary`S County, Maryland
Results
Charlotte Hall, MD 20622

Post-Hypochlorite and Fluoride Monitoring Annapolis Water Treatment Plant
Post-Bid
Annapolis, MD 21401

Broadwater WRF Dewatering Facility Polymer Replacement
Results
$500,000 to $1,000,000 est. value
Churchton, MD 20733

Last Updated 11/06/2020 09:10 AM
Project Title

Hoyes Run Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Oakland, MD 21550 (Caroline, Garrett Counties)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project includes, but is not necessarily limited to, the following: furnishing all labor, materials, equipment and performance of the work for the construction of a dual train 300 gpm water treatment plant; installation of 4,600 LF of 8-inch and 6-inch water mains; 150 LF of ¾” PE service line, 4-inch, 6-inch and 8-inch gate valves, blow off, meter and hydrant assemblies, combination check valve and vault, three (3) check valves & vaults, one (1) pressure reducing valve & vault, 16-inch steel casing (open cut), 8-inch tapping sleeve and valve (hot tap), connecting to the existing water system, installation of various diameter HDPE culverts and HDPE inlets, 290 LF of PVC coated chain link fence with barbed wire, 14-ft double chain link fence gates, installation of approximately 1,080 LF of 2-inch and 4-inch electrical conduits, installation of four (4) electrical and communication pull boxes; installation of approximately 4,500 CY of site fill and testing

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents