Similar Projects
Reported | 08/04/2022 12:00 AM |
Project Title | Repair Bldg 412 HVAC Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | McConnell AFB, KS 67221 (Sedgwick County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction Start Expected September 2022, |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 [brand] Estimate |
Plans Available from | Plan Holders |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work shall include the removal and replacement of various pieces of HVAC equipment, ductwork, piping, fire sprinkler systems, and associated electrical items as indicated in the SOW, the specifications, and the drawings. Additionally the contractor shall construct the cybersecurity requirements for the building DDC system. The Contractor shall provide all labor, materials, tools, expertise, testing, surveying, equipment, reports, samples, warranties, and transportation necessary to complete the project according to the Statement of Work, plans, specifications, and contract documents. The effort will consist of a base bid and one option. The base bid work shall include replacement of AHU's 1, 2, 3, & 11R. Service and Re-Commission AHU-7 & 7E. Also, the Contractor shall replace existing roof relief fans, exhaust fans, unit heaters, fire dampers, clean air grilles and diffusers, low leak dampers, recommission chillers, install required ductwork and piping connections, DDC control circuits and devices, replace condensate lines, clean ductwork, etc. Finally the Contractor shall provide all electrical and controls connections to make all equipment operational. Option 1 work shall include construction of the cybersecurity requirements for the building DDC System as indicated in the specification section 25 05 11. But not limited to, please review the specifications for a complete scope of work. Magnitude of Construction: $1M - $5M Prevailing Wages apply. Contract Duration = 365 days *Amendment 1, 2 and 3 have been released. *Amendment 4 RFI questions have been released. *Amendment 5 has been released. There is revised drawings and additional equipment drawings. *Amendment 6 & 7 have been uploaded. Amendment 7 clarifies cybersecurity scope. Amendment 6 provided direction on the Fire Sprinkler scope. Both are attached for your review/inclusion. |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |