Similar Projects
Last Updated | 09/09/2022 04:01 PM |
Project Title | East Service Area Water and Sewer Extensions |
Physical Address | View project details and contacts |
City, State (County) | Martinsville, IN 46151 (Morgan County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,852,205 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of September 09,2022 this project has not yet been awarded. The project is expected to be awarded on September 24, 2022.** The Work shall include: The installation of new water distribution and sanitary sewer collection system to an area on the east side of the City of Martinsville. The water distribution work includes the installation of 4,855 LF of 12-inch water main, hydrants and valves. The sanitary sewer collection system work includes approximately 10.2 VF of epoxy manhole lining, the installation of a new 10-foot diameter lift station, 3,125 LF of 10-inch HDPE force main and 950 LF of PVC gravity sewer, including new flow metering, piping, mechanical, electrical and instrumentation and control. Work shall be constructed under a Unit Price Contract. Bids shall be properly and completely executed on a State Board of Accounts Form 96 (Revised 2013). Each Bid shall be accompanied by the Contractor's Bid Attachment (included with the Contract Specifications) to Form 96, a Financial Statement (completely filled out and signed) and a bid security in the form of an acceptable certified check payable to the Owner or an acceptable Bidder's bond, in an amount of not less than 5% of the total bid price, in accordance with the Contract Specifications. The Contract will be awarded in accordance with the provisions of IC 5-16-13 for Public Works projects awarded after June 30, 2015. Pursuant to IC 5-16-13-7, the provisions of the law are incorporated by reference. For contracts over $300,000.00, in accordance with IC 5-16-13-10 and IC 8-23-10-0.5, Contractor must be qualified under either IC 4-13.6-4 or IC 8-23-10 (Indiana Department of Administration or Indiana Department of Transportation) before doing any Work on a Public Works project. In accordance with IC 22-5-1.7-11.1, Contractors entering into a contract with the Owner, and contractors of any tier as defined in IC 5-16-13-4, will be required to enroll in and verify the work eligibility status of all newly hired employees through the E-Verify program (effective July 1, 2011), and comply with the reporting requirements of IC 5-16-13-11. In accordance with IC 5-16-13-11, Contractor shall submit an Employee Drug Testing Plan with their Bid and contractors of any tier as defined in IC 5-16-13-4 must comply with the drug testing requirements set forth in IC 4-13-18. Contractors shall complete a Drug Testing Plan Certification to be submitted with their Bid. The Owner reserves the right to waive any informalities or minor defects in bids or bidding procedure, or reject any and all bids, or to accept the bid from the lowest most responsible and responsive bidder as exclusively determined by the Owner. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. No Bidder may withdraw a bid within 60 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the Bidder determined by the Owner to be the lowest most responsible and responsive. Submission of a signed Bid by the Bidder constitutes acknowledgment of and acceptance of all the documents and terms and conditions of the Contractual Legal Requirements and Technical Sections of the specifications in the Project Manual. The Contractor to whom the Work is awarded will be required to furnish an acceptable Performance and Payment Bond each in the amount of 100% of the contract price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. The Contractor to whom the Work is awarded will be required to purchase and maintain insurance coverage as described in the Contract Documents on an "occurrence basis". |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |