Similar Projects
Reported | 06/12/2020 12:00 AM |
Project Title | Brandy Camp Sludge Removal |
Physical Address | View project details and contacts |
City, State (County) | PA (Elk County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Hauling |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor to provide all necessary labor and equipment, on an as-needed basis, to pump sludge at an estimated volume of 250,000 ft.3 and at estimated ten percent (10%) solids from two (2) ponds and dispose of the sludge on a predetermined site (approximately 8,000 feet away) at the Brandy Camp Acid Mine Drainage Treatment Plant, Horton Township, Elk County, in accordance with the terms of this bid proposal. The sludge will be pumped from the northeast pond and the southwest pond on separate occasions. The sludge will be pumped a distance of approximately 8,000 feet with multiple booster pumps to a borehole into a deep mine complex. The Department reserves the right to substitute an alternate sludge disposal site in close proximity to the predetermined site location, if needed. The contract shall commence July 1, 2020 and terminate June 30, 2022. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |