Similar Projects
Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

SCI Smoke Stack Removal
Demolition, Alteration - 847 SF
Bidding
$720,000 est. value
Lancaster, OH 43130

Emergency Repair Program
Alteration
Bidding
Columbus, OH

Water Meter Back Flow Preventer
Post-Bid
Less than $1,380,000 est. value
Columbus, OH

Innovation Center Pre-Purchased Boilers
Post-Bid
Athens, OH 45701

Y--1B229 Mechanical Room (VA-19-00027342)
Results
$250,000 to $500,000 est. value
Cleveland, OH 44106

J--Cooling Towers - Refurbish/Repair
Results
Columbus, OH 43219

Chiller Replacement at the Cambrian
Alteration
Bidding
Jackson, OH 45640

Mechanical Maintenance needs for Various Stark County Buildings
Post-Bid
Canton, OH 44702

Replace Fan Coil Units Building 7 Sinclair Community College
Results
$200,000 est. value
Dayton, OH

Vacuum Booster Pump Maintenance
Post-Bid
Sandusky, OH

Project CSC-20082 Overhaul AFD on Existing Chillers, Building 23 at DSCC in Columbus, OH, FH 20
Results
Columbus, OH 43218

Replacement Boilers
Post-Bid
Dayton, OH 45402

Y1NB--552-19-107: Replace Boilers (Building 147)
Results
$5,000,000 to $10,000,000 est. value
Dayton, OH 45428

Last Updated 12/08/2021 11:24 AM
Project Title

Filter Console Replacement

Physical Address View project details and contacts
City, State (County) Dayton, OH 45402   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The specification describes the steps that are involved, details the various items, and additional servi ces that will have to be provided by the vendor or the City of Dayton. We are looking for a quote on one Filter Console and the average time required to finish one filter console install. The goal is to finish at least seven Filter Consoles total this year. Filter Consoles 3, 5, 7, 9, 11, 13, and 15 are slated to be finished this year. A Filter will be taken out of service and the replacement will be installed

Details

Division 46 - Water and Wastewater Equipment, Filtration Equipment, Pressure Filters.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents