Similar Projects
Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Engineering, Planning and Development
Post-Bid

C--Multiple Award Task Order Contract (MATOC)
New Construction, Term Contract
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

Microgrid Architectural And General Engineering Services
New Construction, Term Contract
Post-Bid
$10,000,000 est. value

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Regional A-E Survey and Mapping Services Multiple Award Task Order Contract
Term Contract
Post-Bid
$25,000,000 to $3,500,000 est. value

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

National Guard Bureau, Region 2, Architect and Engineering Indefinite Delivery Indefinite Quantity Contract for Vertical Projects
Results
$75,000 to $40,000,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Multimedia Environmental Compliance Engineering Support for Navy, Marine Corps, and other DOD Installations, and Federal Agencies
Results
Norfolk, VA

Last Updated 10/14/2022 07:04 AM
Project Title

RFP Design - Yankee Springs State Recreation Area(YSRA) / Fort Custer State Recreational Area(FCRA) Toilet Buildings Upgrades/Replacements

Physical Address View project details and contacts
City, State (County) Middleville, MI 49333   (Barry County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids
Project Status Construction start expected October 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

On behalf of the Michigan Department of Natural Resources (DNR) Parks and Recreation Division (PRD), the Department of Technology, Management, and Budget (DTMB) is requesting professional architectural and engineering services for the assessment, design, bidding, and construction administration of 1) renovations to two Yankee Springs State Recreation Area Beach House buildings, and 2) replacement of two Fort Custer State Recreational Area campground toilet-shower buildings. Please do not submit online questions via VSS. ALL questions should be emailed to Heather DeKorte at dekorteh@michigan.gov address no later than 5:00 p.m., Eastern on October 12, 2022. This request is to provide Phase 200 Program, Phase 300 Schematic Design, Phase 400 Design Development, Phase 500 Final Design, Phase 600 Construction Administration/Office, and Phase 700 Construction Administration/Field Inspection Services for the Main Beach House Building and the Murphys Point Beach House building. The PSC will perform a comprehensive Building Condition Assessment and Needs Assessment of both buildings. Building improvements for consideration will include the entire building enclosure, including window maintenance, masonry repointing, the concrete knee wall around the Main Beach House building, and exterior access from the parking lot to the building. Interior spaces will require reconfiguration to provide improved circulation, accessibility (including bathrooms), and an alternative use layout for Murphys Point. Interior finishes will be upgraded. The building structure and systems (MEP, HVAC, etc.), and utilities should be evaluated. New bathroom and concession plumbing fixtures, electrical fixtures and lighting, electrical panel upgrades, etc. are desired. The building and all systems will be upgraded to accommodate current and proposed functions and meet current codes. The roofs on both buildings have been recently upgraded. The method of contractor selection has not been determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents