Similar Projects
Corteau Winery
New Construction - 6,562 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Mechanicsville, MD

Ingleside Mine Phase 2
Addition
Conception
Ingleside, MD 21640

Frederick Commerce Center, Lot 3
New Construction - 220,150 SF
Design
Frederick, MD

Jason Pharmaceuticals
Renovation, Addition - 10,022 SF
Post-Bid
Owings Mills, MD 21117

Disposition and Development of Carvel Hall
- 70,321 SF
Post-Bid
Crisfield, MD 21817

TCF05 - Project Monarch Interiors & MEP
New Construction - 279,000 SF
Construction
$85,000,000 est. value
Urbana, MD

Protenergy
Renovation
Construction
Cambridge, MD 21613

Dixon Campus - Phase III
New Construction - 100,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Chestertown, MD

Scratch Free Packaging
New Construction - 10,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Easton, MD

Bainbridge Redevelopment
New Construction
Conception
Port Deposit, MD 21904

Aphena Building 3
Renovation - 54,000 SF
Construction
Easton, MD 21601

LIW Ironworks
New Construction - 19,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Fort Washington, MD

Fisher Chicken Processing Plant
New Construction - 2,400 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Mechanicsville, MD

Big Truck Wye Farm Brewery
New Construction - 9,652 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Queenstown, MD 21658

Wood Farm Mineral Extraction Facility
New Construction
Pending Verification
Denton, MD 21629

Reported 11/24/2020 01:59 PM
Project Title

Plug Power - Hydrogen Fueling Facility

Physical Address View project details and contacts
City, State (County) Hagerstown, MD 21742   (Washington County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method
Project Status Construction Commenced November 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will include building an equipment compound outside of the center, routing conduit and high pressure gas piping into the building and installing hydrogen dispensers inside the distribution center.

Details

Manufacturing/Processing Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals.
Division 11 - Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents