Similar Projects
Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Construction of the Cedar Heights Stormwater Improvements
Post-Bid
Kanab, UT 84741

2019 Public Works Project
Results
Hyrum, UT 84319

Utah Caldwell Wash Storm Drain Improvements
Results
Washington, UT 84780

Installation of A Storm Drain Line Extension On 200 East
Construction
Enterprise, UT 84725

Storm Drain Along Uprr Union Avenue to Main Street
Post-Bid
North Salt Lake, UT 84054

Construction of the 800 West Improvement Project
Results
West Bountiful, UT 84087

2550 South Phase 3 Improvement Project
Post-Bid
West Haven, UT 84401

3700 West Storm Drain Connection
Results
Less than $125,000 est. value
Layton, UT 84040

Scottish Drive Storm Drain and Waterway Project
Post-Bid
Cottonwood Heights, UT 84093

2020 Storm Drain Projects
Results
Blanding, UT 84511

Storm Sewer Cleaning and Maintenance
Term Contract
Post-Bid
Salt Lake City, UT 84114

Spanish Valley Clinic Sewer Main Line
Results
Less than $155,162 est. value
Monticello, UT

Retrofit Existing Stormwater Grate
Post-Bid
Riverton, UT 84096

Crown Street Storm Drain Improvement Project
Results
Taylorsville, UT 84129

Last Updated 06/03/2021 10:14 AM
Project Title

2021 Provo City Franklin Park Storm Drain - Phase 1 Project

Physical Address View project details and contacts
City, State (County) Provo, UT   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 to $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of existing asphalt, concrete curb, gutter, sidewalk and other concrete improvements. Installation of 15" to 48" storm drain piping, 60" bore under railway tracks. Remove and replace sewer laterals and sewer main. Installation of new asphalt, road base, subbase, curb and gutter, sidewalk, and other concrete improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents