Similar Projects
Streambank Stabilization and Restoration
Infrastructure
Bidding
Atlanta, GA

Buice Road (West) Traffic Calming Project
Infrastructure, Alteration
Bidding
Johns Creek, GA

North Springs High School Baseball Outfield Slope Repair
Infrastructure
Post-Bid
Atlanta, GA 30328

Baseball Field Drainage For Milton And Northview High Schools
Infrastructure
Post-Bid
Johns Creek, Milton, GA 30004

Sweetwater Creek Rehabilitation - Phase 1
Results
Less than $2,022,280 est. value
East Point, GA

5280 North Powers Ferry Road Phase 1 Streambank Repair and Culvert Replacement Project
Results
Sandy Springs, GA 30328

T32-D7-Drainage-I75 Northside-105634
Results
GA

Restraining Joint Fittings for Cast and Ductile Iron Pipe
Term Contract
Results
Atlanta, GA 30303

PVC Schedule 40 DWV Pipe
Term Contract
Results
GA

Pipe Replacement at 345 High Oaks Court
Results
Johns Creek, GA 30005

Old Savannah Square, Resurfacing and Drainage Improvements
Results
Union City, GA 30291

City Hall Pond Rehabilitation and Expansion
Results
Roswell, GA 30075

Public Works Maintenance and Operations Services
Results
Milton, GA 30004

T32-D7-Drainage Rehab-Various-107712
Results

Hammond Park Erosion and Improvement Project
Results
Sandy Springs, GA 30328

Last Updated 08/16/2021 03:09 PM
Project Title

Nancy Creek at Windsor Meadows Stream and Water Quality Improvements Project

Physical Address View project details and contacts
City, State (County) Sandy Springs, GA   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $754,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The stream banks of Nancy Creek at the Project site are approximately 12 feet tall and much of the streambank has no vegetative cover and is actively eroding. The implementation of this Project will stabilize the streambank on approximately 200 linear feet and redirect the main stem flow during bankfull and smallerevents to provide a significant reduction in the sediment load which will contribute to meeting the sediment reduction goal of the TMDL plan for Nancy Creek. The instream structure used to redirect flow will also improve fish habitat. The proposed RSC will treat runoff from paved areas along Windsor Parkway that do not currently receive any treatment prior to discharge into Nancy Creek.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents