Similar Projects
Kansas Juvenile Correctional Complex Electrical Service Modifications
Renovation, Alteration
Results
$295,000 est. value
Topeka, KS 66618

Juvenile Detention Center Masonry Repair
Renovation, Alteration
Results
Olathe, KS 66061

Construction Manager at Risk - Construction of the Marshall County Jail
New Construction
Post-Bid
Marysville, KS

New Century Adult Detention Center (NCADC) - EIFS Repair and Restoration
Renovation
Results
Olathe, KS 66061

NCF Industrial Building for Textiles
Renovation
Results
$75,000 est. value
Norton, KS 67654

Lansing Building X
Renovation
Results
$2,100,000 est. value
Leavenworth, KS 66048

Winfield Correctional Facility E and F Dorm
Renovation
Results
$4,980,500 est. value
Winfield, KS 67156

Max-Medium Unit Chiller Replacement
Renovation
Results
$475,000 est. value
Topeka, KS 66618

Design Build for FCI Leavenworth
New Construction
Post-Bid
$300,000,000 est. value
Leavenworth, KS 66048

RFP D/B - Federal Correctional Institute (FCI) - City of Leavenworth
New Construction, Infrastructure
Post-Bid
$300,000,000 CJ est. value
Leavenworth, KS 66048

Metal Roof Retrofit Fire House - Winfield Correctional Facility Fire House (WCF)
Renovation
Post-Bid
$39,134 CJ est. value
Winfield, KS 67156

Police Training Center Facility - PD-22-0005 - City of Lawrence
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Lawrence, KS 66049

Last Updated 10/24/2022 08:15 AM
Project Title

Juvenile Detention Facility Negative Pressure Room Remodel

Physical Address View project details and contacts
City, State (County) Wichita, KS 67211   (Sedgwick County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $330,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Provide a negative isolation Room J121, a new roof mounted exhaust fan (250 CFM) of exhaust from room via a ceiling security grille. A motorized damper in the existing exhaust duct serving the space. DDC controls will be installed for negative isolation sequences. That sequence will include starting of the new isolation exhaust fan 120-volt power and closing of the motorized damper in the existing exhaust duct. If you choose to send a hard copy of your bid, Sedgwick County will not accept submissions that arrive late due to the fault of the U.S. Postal Service, United Parcel Service, DHL, FedEx, or any other delivery/courier service. A RECOMMENDATION FOR CONTRACT AWARD: will be made to the Board of Bids and Contracts at its regular meeting at 10:00 am on Thursday, November 3, 2022, generally held in the County Commission Meeting Room located at 525 North Main, Third Floor, Wichita, Kansas, 67203, although this date or location could change. CONTRACT AWARD: Board of County Commissioners will consider award on Wednesday, November 9, 2022, although this date could change. Inquiries regarding Bid Documents, Bid/Selection process or any requests for information about this specific project shall be directed in writing only to: Lee Barrier, Purchasing Agent 100 N. Broadway Avenue, Suite 610 Wichita, KS 67202 Telephone: (316) 660-7258 Fax: (316) 383-7055 E-mail: Lee.Barrier@sedgwick.gov Bidders are encouraged to examine bidding documents as early as possible. In order to ensure each bidder has the most current information for bidding there is an established date and time for last questions to be asked. Bidders requiring clarification or interpretation of the Bidding Documents shall make such requests, in writing only, to Lee Barrier, Purchasing Agent, at Lee.Barrier@sedgwick.gov no later than 5:00 pm on Monday, October 17, 2022.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents