Similar Projects
Shake Shack / Des Peres
New Construction, Infrastructure - 3,453 SF
Design
$1,000,000 CJ est. value
Des Peres, MO 63131

Fee Fee Road (Westport Plaza Drive to Schuetz Road)
New Construction, Infrastructure
Bidding
$1,452,746 CJ est. value
Maryland Heights, MO 63043

Fee Fee Road (Westport Plaza Drive to Schuetz Road)
New Construction, Infrastructure
Bidding
$1,452,746 CJ est. value
Maryland Heights, MO 63043

2022 and 2023 Citywide Sidewalk
Post-Bid
$969,502 est. value
Saint Louis, MO

Installation of a Walking Track
Infrastructure
Post-Bid
Overland, MO

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

Exterior ADA Concrete Ramps and Main Entry Stairs
Infrastructure
Post-Bid
Kirkwood, Saint Louis, MO 63122

2020 CRS Pavement Rehabilitation
Infrastructure
Results
MO

Louisiana Calm Street
Infrastructure
Post-Bid
$108,487,725 est. value
Saint Louis, MO

University Drive , Grobman Road and North Campus West Drive Paving
Infrastructure
Results
Saint Louis, MO

On-Call Roadway Maintenance
Term Contract
Post-Bid
Town and Country, MO

Asphalt Repairs
Infrastructure - 9,212 SF
Results
Clayton, MO

Florissant Road Improvements
Infrastructure
Post-Bid
Ferguson, MO 63135

2021 Concrete Pavement Replacement
Infrastructure
Results
Creve Coeur, MO

Last Updated 01/12/2023 05:10 PM
Project Title

North Hanley Road (A) Resurfacing

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63121   (Saint Louis County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $3,345,399 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

St. Louis County Project No. AR-1482 Federal Project No. STP-5613(607) consists of the removal and replacement of deteriorated and/or damaged pavement, curbs, and sidewalks; pavement surfacing and texturing; Superpave asphaltic concrete overlay, removal and replacement of sidewalk curb ramps, removal and backfilling of retaining walls, traffic signal removal and replacement, sodding and other incidental items on North Hanley Road from St. Charles Rock Road to Natural Bridge Road within St. Louis County. The successful Bidder or Bidders shall be required to comply with the most current applicable Federal (DavisBacon Act) and State statutory provisions concerning the payment of prevailing wages on public works, Section 290.210 through 290.340 R.S. Mo. 1959, as amended. All contractors must be on the Missouri Department of Transportation's approved contractor listing, seven (7) days prior to bid opening. Contractors and sub-contractors who sign a contract to work on a public works project shall provide a ten (10) hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. St. Louis County hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. All questions must be submitted by 5:00 p.m. on September 28, 2022 via e-mail to the Contract Administrator (Shandrika Combs, SCombs@stlouiscountymo.gov). Bids must be accompanied by a certified check or bidder's bond in an amount equal to 5% of the total bid. All checks shall be made payable to "Treasurer, St. Louis County." The right is reserved by the St. Louis County to reject any or all bids. The DBE Goal for this project is 16%. No 2nd tier subcontracting will be allowed on this project. MODOT - North Hanley Road (A) Resurfacing

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents