Similar Projects
Williams Street Multifamily Development
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Warwick, RI 02889

Williams Street Multifamily Development
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Warwick, RI 02889

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Asphalt Pavement Improvements
Infrastructure
Post-Bid
Coventry, RI

2021 Paver Placed Elastomeric Surface Treatment C-1
Results

Priority Steel Repairs to Bridge 061901
Results
Warwick, RI

Woodsprings Suites - Post Road / Warwick
New Construction, Infrastructure
Pending Verification
$30,400,000 CJ est. value
Warwick, RI 02886

Woodsprings Suites - Post Road / Warwick
New Construction, Infrastructure
Pending Verification
$30,400,000 CJ est. value
Warwick, RI 02886

Gravity Thickner #1, #2 & Odor Control Rehabilation - City of Warwick
Infrastructure
Conception
$725,000 CJ est. value
Warwick, RI 02889

Site Improvements at Shawomet Terrace
Infrastructure
Post-Bid
Warwick, RI 02889

Road Rehabilitation Services Various Roads, Reclamation
Infrastructure
Results
$4,000,000 to $4,500,000 est. value
West Warwick, RI

Post Road Contractor Storage Building
New Construction, Infrastructure - 70,000 SF
Pending Verification
$7,600,000 CJ est. value
Warwick, RI 02888

Cedar Swamp Force Main & Pump Station Rehabilitation - City of Warwick
Infrastructure
Conception
$2,000,000 CJ est. value
Warwick, RI 02889

Crack Seal and Micro Surfacing
Infrastructure
Post-Bid
Warwick, RI

Cumberland Farms Car Wash - Fessenden Street / Warwick
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Warwick, RI 02886

Last Updated 09/08/2022 06:32 PM
Project Title

Bridge Group 33A - I-295 Providence St

Physical Address View project details and contacts
City, State (County) West Warwick, RI 02893   (Kent County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Rhode Island Contract No. 2022-CB-021, Federal Aid Project No. BRO-0726(001), PTS ID No. 2603G includes the replacement of the Bridge 072601 superstructure and partial replacement of the Bridge 072601 substructure carrying Providence Street over I-295. The proposed superstructure will be constructed on temporary abutments and center pier support structures located to the south of the existing bridge, then moved northward into its final position utilizing a lateral bridge slide operation. Upon completion of the slide, temporary barriers will be placed along the bridge corners, waterproofing membrane and bituminous pavement will be installed, and the structure opened for traffic. Certain construction activities will be completed after the proposed bridge is open to traffic, including but not limited to the removal of all temporary works, and utility connections / final relocations. RI DOT - Bridge Group 33A - I-295 Providence St This work consists of the removal, disposal and restoration of that portion of the existing concrete sidewalk, the removal, stockpile, and resetting of the existing granite curb, and the installation and removal of temporary ADA compliant wheelchair ramps at locations shown on the Plans. Upon the completion of the bridge work, the temporary wheelchair ramps shall be removed and the curb and sidewalk restored. The existing roadway pavement and sidewalk shall be saw-cut at the temporary wheelchair locations shown on the Plans. Portions of the existing concrete sidewalk and pavement will be removed and disposed. Existing granite curb will be stockpiled on-site to be reinstalled upon the completion of the bridge sidewalks. The ramp areas shall be excavated, graded, compacted and covered with a 2 inch minimum layer of temporary hot mix asphalt and a detectable warning system to form the ADA compliant wheelchair ramp as directed by the Engineer

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents