Similar Projects
Murphy USA #7172/7850 / Baxley
New Construction, Infrastructure - 1,400 SF
Design
$1,500,000 CJ est. value
Baxley, GA 31513

SR 203 From SR 121 / Appling to Wayne County Line
Infrastructure
Design
$1,000,000 CJ est. value
Surrency, GA 31563

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

T32-D5-Pavepres-SR 121 Appling MM 4-14-122750
Infrastructure
Results
GA

Agriculture Meter Installation
Infrastructure
Results

SR 203 From Big Satilla Creek to SR 121
Infrastructure
Design
$1,000,000 CJ est. value
Surrency, GA 31563

T32 - District 5 Routine Maintenance Services
Infrastructure
Post-Bid
Baconton, Evans, GA 30809

Appling County Satellite Center Site Improvements
Infrastructure
Results
Baxley, GA 31513

2022 LMIG
Infrastructure
Post-Bid
GA

Comprehensive Maintenance Services
Infrastructure
Post-Bid

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

RFP D/B - Design-Build- 8 Unit T-Hangar Building
New Construction, Infrastructure
Post-Bid
$425,000 CJ est. value
Baxley, GA 31513

RFP D/B - Three Corporate Hangars
New Construction, Infrastructure
Post-Bid
$800,000 CJ est. value
Baxley, GA 31513

Last Updated 11/14/2022 11:34 AM
Project Title

Baxley - Emergency Storm Drainage Improvements - Bay Street

Physical Address View project details and contacts
City, State (County) Baxley, GA 31513   (Appling County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $279,696 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this Contract will consist generally of the following: The construction of +-374 LF (Dual 187 LF) of 30" RCP pipe, two (2) GDOT STD 1125 headwalls, one (1) ditch drop inlet, two (2) GDOT STD 1034 D catch basins, relocating +-50 LF 8" gravity sewer main, relocating +-50 LF 6" water main, abandoning a 4" water main, +-50 SY GDOT STD Type 1 Rip-Rap, regrading ditch, replacing concrete curb and gutter, +- 50 LF concrete sidewalk removal and replacement, +-220 SY Class "A" pavement removal and replacement, and all other necessary appurtenances for a complete job. All work on the Project must be completed within 120 consecutive calendar days of date of notice to proceed. Bid shall be submitted on Bid Proposal Forms furnished for that purpose, in accordance with the Contract Documents and the Plans and Specifications, which are on file and may be reviewed at the office of the Mayor and the office of Hofstadter and Associates, Inc., Consulting Engineers, 4571 Arkwright Road, Macon, Georgia 31210. No bid will be considered unless sealed and filed with City of Baxley prior to the time set forth above, and accompanied by a Bidders Bond, payable to City of Baxley, for 10 percent of the amount of the bid; to be forfeited as liquidated damages in the event that the bid be accepted and the bidder fail to enter promptly into a written contract and furnish the required Payment Bond and Performance Bond and Insurance Certificates. Bids arriving after the designated time will be returned unopened. No bids shall be withdrawn for a period of 60 days after the opening of bids. CITY OF BAXLEY reserves the right to reject any or all bids and to overlook and/or disregard informalities or irregularities in the proposals.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents