Similar Projects
Home2Suites and Hilton Garden Inn / Edwardsville
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Edwardsville, IL 62025

Thrivent and Legacy Planning
New Construction
Design
$1,000,000 est. value
Collinsville, IL 62234

Public Works Facility - City of Collinsville
New Construction - 52,000 SF
Design
$19,000,000 est. value
Collinsville, IL 62234

Melvin Price Lock & Dam Main Lock Lift Gate Install & Machinery Replacement
Infrastructure
Bidding
$10,000,000 CJ est. value
East Alton, IL 62024

Resurfacing and ADA Improvements on US 67 /IL 111
Infrastructure
Bidding
$2,000,000 CJ est. value
Godfrey, IL 62035

Weatherization 100 Year Floodplain Project
New Construction
Post-Bid
Granite City, Madison, IL 62040

HVAC Services
Term Contract, Alteration
Post-Bid
Collinsville, IL

Riverfront Development Phase 8
Results
$2,727,884 est. value
Alton, IL 62002

Building Inspector's Office
New Construction, Renovation
Results
Glen Carbon, IL

Starbucks / Collinsville
New Construction, Infrastructure - 2,226 SF
Construction
$400,000 CJ est. value
Collinsville, IL 62234

Addition and Renovation Dorris Intermediate School
Addition, Demolition, Renovation, Infrastructure - 14,000 SF
Construction
$6,000,000 CJ est. value
Collinsville, IL 62234

Alvareita`s Interior Renovation
Renovation
Pending Verification
Edwardsville, IL 62025

2022 Bond - Highland Primary School and Middle School Addition - Highland CUSD #5
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Highland, IL 62249

Resurfacing and ADA Upgrades on IL 159
Infrastructure
Bidding
$2,000,000 CJ est. value
Edwardsville, IL 62025

Re-Development of the Old Lincoln School Site
Infrastructure
Post-Bid
Wood River, IL 62095

Last Updated 09/22/2022 02:31 PM
Project Title

Anderson- Goshen Campus

Physical Address View project details and contacts
City, State (County) Edwardsville, IL 62025   (Madison County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 22, 2022, this project is under review with the Edwardsville Plan Commission. Although there is not a firm timeline, construction could begin in first quarter 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents