Similar Projects
Last Updated | 10/01/2020 08:24 AM |
Project Title | PFAS Improvements Phase 1 Interim Water Main |
Physical Address | View project details and contacts |
City, State (County) | Dudley, MA 01571 (Worcester County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of installing approximately 1,700 linear feet of 8-inch ductile iron transmission main between Pump Station No. 3 on Schofield Avenue (Route 12) and Pump Station No. 6 on New Boston Road to blend the sources and create a single point of entry into the distribution system at Pump Station No. 6. This project will also include installing approximately 450 linear feet of 12-inch ductile iron water main from Pump Station No. 6 to the existing water main on New Boston Road and replacement of approximately 450 linear feet of undersized cast iron water main on New Boston Road with new 12-inch ductile iron water main |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |