Similar Projects
Burger Baylor Gutters Replacement
Infrastructure
Bidding
MI

Residential Development of City-Owned Lots
Post-Bid
Highland Park, MI

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Big Rapids, Canton, Fort Gratiot, Gaylord, Holland, Muskegon, Rochester Hills, Southgate, Sterling Heights, Warren, Ypsilanti, MI

Rest Areas and Welcome Centers Across the State
Term Contract
Results

Public Safety Parking Lot Reconstruction
Results
Taylor, MI

Northline Sidewalk Project
Post-Bid
Taylor, MI

PCCS Parking Lot- Bid Package 19
Results
Plymouth, MI

Traffic & Safety Parking Terminals And 3 Yr. Contract
Post-Bid
Detroit, MI

Iron Belle Trail: Phase 2 Trailhead and Phase 1 Loop Trail
Results
Detroit, MI

2020 Sidewalk Gaps and Replacement Program
Post-Bid
Plymouth, MI

Envision Center HVAC, Improvement/Accessibility Modifications
Results
Inkster, MI

ADA Restrooms Renovation Project (CDBG)
Term Contract
Post-Bid
Redford, MI 48239

Garden City High School Orchestra Pit Platform
Results
Garden City, MI 48135

Construct Green Infrastructure Improvements To The Property Located At 4401 Conner St
Post-Bid
Detroit, MI 48200

Lower Huron Hike / Bike Trail Reconstruction
Results
Belleville, MI 48111

Last Updated 07/12/2021 04:09 AM
Project Title

0.23 MI of Hot Mix Asphalt Shared-Use Path

Physical Address View project details and contacts
City, State (County) MI   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Item No : 2107 017 Contract ID : 82000-204928 Control Sec : TAU 82000 Job No : 204928A Federal No : 21A0663 0.23 mi of hot mix asphalt shared-use path and parking lot, and integral curb with concrete sidewalk along Edward N. Hines Drive south of Ann Arbor Trail and north of Hines Drive, Wayne County. Section: 1 0010 Mobilization, Max $41,200.00 1500001 1.000 LSUM 0020 Stump, Rem, 6 inch to 18 inch 2020008 6.000 Ea 0030 Curb, Rem 2040021 24.000 Ft 0040 Sidewalk, Rem 2040055 145.000 Syd 0050 Embankment, CIP 2050010 287.000 Cyd 0060 Excavation, Earth 2050016 847.000 Cyd 0070 Subgrade Undercutting, Type II 2050041 2,667.000 Cyd 0080 Erosion Control, Inlet Protection, Fabric Drop 2080020 2.000 Ea 0090 Erosion Control, Silt Fence 2080036 2,007.000 Ft 0100 Aggregate Base, 4 inch 3020010 94.000 Syd 0110 Aggregate Base, 6 inch 3020016 584.000 Syd 0120 Aggregate Base, 8 inch 3020020 1,745.000 Syd 0130 Open-Graded Dr Cse, CIP 3030030 52.000 Cyd 0140 Aggregate Surface Cse, 6 inch 3060010 573.000 Syd 0150 Culv End Sect, Metal, 12 inch 4010094 6.000 Ea 0160 Culv End Sect, Metal, 15 inch 4010095 2.000 Ea 0170 Culv, Cl F, 12 inch 4010607 140.000 Ft 0180 Culv, Cl F, 15 inch 4010608 50.000 Ft 0190 HMA Approach 5010061 378.000 Ton 0200 _ Integral Curb with Sidewalk, 4 inch 6027011 207.000 Syd 0210 Driveway, Reinf Conc, 8 inch 8010003 75.000 Syd 0220 Detectable Warning Surface 8030010 47.000 Ft 0230 Curb Ramp Opening, Conc 8030030 33.000 Ft 0240 Sidewalk Ramp, Conc, 4 inch 8030034 357.000 Sft 0250 Sidewalk, Conc, 4 inch 8030044 753.000 Sft 0260 Shared use Path, Aggregate, LM 8060011 257.000 Cyd 0270 Shared use Path, Grading 8060030 1,196.000 Ft 0280 Shared use Path, HMA 8060040 355.000 Ton 0290 _ Shared use Path, Grading, Mod 8067001 300.000 Ft 0300 Fence, Protective 8080007 1,341.000 Ft 0310 Post, Steel, 3 lb 8100371 217.000 Ft 0320 Sign, Type IIIA 8100404 103.000 Sft 0330 _ Bumper Block 8107050 2.000 Ea 0340 Pavt Mrkg, Ovly Cold Plastic, 12 inch, Crosswalk 8110041 300.000 Ft 0350 Pavt Mrkg, Preformed Thermoplastic, Accessible Sym 8110204 6.000 Ea 0360 Pavt Mrkg, Waterborne, for Rest Areas, Parks, & Lots, 4 inch, Blue 8110293 309.000 Ft 0370 Pavt Mrkg, Waterborne, for Rest Areas, Parks, & Lots, 4 inch, White 8110294 540.000 Ft 0380 Barricade, Type III, High Intensity, Double Sided, Lighted, Furn 8120012 4.000 Ea 0390 Barricade, Type III, High Intensity, Double Sided, Lighted, Oper 8120013 4.000 Ea 0400 Lighted Arrow, Type B, Furn 8120130 2.000 Ea 0410 Lighted Arrow, Type B, Oper 8120131 2.000 Ea 0420 Minor Traf Devices 8120170 1.000 LSUM 0430 Plastic Drum, Fluorescent, Furn 8120252 80.000 Ea 0440 Plastic Drum, Fluorescent, Oper 8120253 80.000 Ea 0450 Sign, Type B, Temp, Prismatic, Furn 8120350 420.000 Sft 0460 Sign, Type B, Temp, Prismatic, Oper 8120351 420.000 Sft 0470 Traf Regulator Control 8120370 1.000 LSUM 0480 _ Boulder Retaining Wall 8137001 99.000 Ft 0490 _ Ditch, Plain Cobble, Modified 8147011 33.000 Syd 0500 Site Preparation, Max $1,720.00 8150001 1.000 LSUM 0510 Watering and Cultivating, First Season, Min $835.00 8150002 1.000 LSUM 0520 Watering and Cultivating, Second Season, Min $1,030.00 8150003 1.000 LSUM 0530 Cornus sericea, #3 cont. 8151063 6.000 Ea 0540 Pennisetum alopecuroides, #1 cont. 8152649 22.000 Ea 0550 Pinus strobus, 8 foot 8152872 3.000 Ea 0560 Spiraea x bumalda Anthony Waterer, #3 cont. 8153613 3.000 Ea 0570 _ Betula nigra 'Heritage', clump form, 12 foot 8157050 3.000 Ea 0580 _ Spiraea alba, #3 cont. 8157050 6.000 Ea 0590 _ Double Shredded Hardwood Bark Mulch, 3 inch Depth 8167011 462.000 Syd 0600 _ Landscape Fabric 8167011 368.000 Syd 0610 _ Turf Establishment, Performance 8167011 1,394.000 Syd 0620 _ Planting Mix 8167021 10.000 Cyd 0630 _ Rain Garden Planting Mix 8167021 124.000 Cyd 0640 _ Rain Garden Seed MIx 8167030 4.000 Lb 0650 _ Bench, Reloc 8167050 2.000 Ea 0660 _ Bike Rack, Reloc 8167050 2.000 Ea 0670 _ Boulder, Reloc 8167050 28.000Ea 0680 _ Ledge Stone Step 8167050 7.000 Ea

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents