Similar Projects
Purcell Road Lift Station
New Construction
Post-Bid
$2,500,000 est. value
Paragould, AR

Jamison and Arch Street Pump Station Modifications
New Construction
Post-Bid
Little Rock, AR 72209

Jefferson Street Pump Station Improvements
Results
Fulton, AR

Field Pump Station Improvements
New Construction
Results
Redfield, AR

Wastewater System Improvements - Contract Section II (Wastewater Treatment Facility)
New Construction, Infrastructure
Post-Bid
Alpena, AR

Fairwood and Molly Creek Pump Station Improvements
New Construction
Results
Hot Springs, AR

Birdtown Pump Station Upgrade
Addition, Alteration
Post-Bid
$400,000 est. value
Springfield, AR 72157

Blanchard Springs Caverns VIC Lift Station
Renovation
Results
Fifty-Six, AR 72533

Wastewater Pump Station Flood Damage Repairs and Mitigation Project Fourth Phase (PS-28 North 6th Street and PS-29 South 98th Circle No. 19-29-C4)
Renovation
Post-Bid
Fort Smith, AR

Wastewater Force Main and Pump Station Improvements
New Construction, Infrastructure
Results
$1,200,000 est. value
AR

Pump Station 3 and Pump Station 4 Rehabilitation and Common Force Main
Renovation
Post-Bid
West Memphis, AR

Wastewater Lift Station #3 Rehabilitation
Renovation
Results
$90,000 est. value
Oak Grove Heights, AR

Construction of Five (5) Sewer Pump Stations
Renovation
Post-Bid
Dumas, AR

Pump Station Building Rehabilitation
Renovation
Results
Hot Springs, AR

Bridgeway Pump Station Gravity Conversion
New Construction
Post-Bid
$425,000 est. value
North Little Rock, AR

Last Updated 01/13/2022 10:45 AM
Project Title

Wastewater System Improvements Wastewater Lift Station 4 Rehabilitation

Physical Address View project details and contacts
City, State (County) Corning, AR   (Clay County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a new wet-well, valve vault, and controls to replace the existing Lift Station #4 and other related appurtenances

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents