Similar Projects
Greenwood - Spencer, Elm Drive to East County Line
Bidding
Greenwood, Spencer, WI

Caroline Street Reconstruction LRIP
Bidding
Athens, WI 54411

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

UW – Stevens Point at Wausau Parking Lot Reconstruction
Post-Bid
Wausau, WI 54401

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Stewart Avenue Resurfacing
Results
Wausau, WI 54403

LRIP Road Improvements
Bidding
Abbotsford, WI 54405

Airport Surfacing
Post-Bid
Brookfield, Janesville, Lancaster, Tomah, Waukesha, Wausau, Woodruff, WI 53072

Motor Vehicles Storage Compound Expansion
Results
$700,000 est. value
Mosinee, WI 54455

Statewide Pavement Maintenance 2021-2022
Term Contract
Bidding
Less than $5,000 est. value

2021 Street Improvements
Post-Bid
Less than $124,000 est. value
Edgar, WI

North 4th Avenue Improvements
Results
Less than $750,000 est. value
Abbotsford, WI 54405

2021 Sidewalks
Bidding
Wausau, WI

2021 Street Construction Project A
Post-Bid
Wausau, WI

2021 Street and Utility Improvements
Results
$95,000 est. value
Edgar, WI

Last Updated 11/24/2020 01:33 PM
Project Title

Sunset Ridge Drive

Physical Address View project details and contacts
City, State (County) Stratford, WI 54484   (Marathon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $308,338
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The overall description of the project, to be completed under one contract, is the completion of approximately 1,810 feet of an urban street section. The existing roadway was previously completed through gravel. In general, the work includes additional base course, curb/gutter, drive aprons, sidewalk, adjusting structures, restoration, and pavement. The approximate units of the major work items are as follows; 1) Base Course – 910 cu yds 2) Concrete Curb and Gutter – 3,629 feet 3) Sidewalk/Aprons – 1,392 sq yds 4) Restoration – 6,477 sq yds 5) Asphalt Pavement – 1,264 tons

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents