Similar Projects
Avalon Pedestrian Bridge and Gateway Projects - Port of Los Angeles - Construction Division
New Construction, Infrastructure
Conception
Los Angeles, CA 90744

Berths 177-178 Wharf Restoration - Port of Los Angeles - Construction Division
Infrastructure
Conception
$11,400,000 est. value
Los Angeles, CA 90081

One Beverly Hills
Demolition, New Construction, Renovation, Infrastructure
Design
$2,000,000,000 CJ est. value
Beverly Hills, CA 90210

Violet Street Mixed-Use Building
New Construction, Infrastructure - 511,604 SF
Design
$100,000,000 CJ est. value
Los Angeles, CA 90021

Los Angeles Valley College Academic Complex 1
New Construction, Infrastructure - 80,000 SF
Post-Bid
$60,000,000 CJ est. value
Los Angeles, CA 91401

RFQ D/B - Los Angeles Valley College Demolition of Theater Arts Building
Demolition, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Los Angeles, CA 91401

Rehabilitation of Wells Commission 15 and Commission 18
Infrastructure
Results
$3,496,020 CJ est. value
Long Beach, CA 90808

Colorado Lagoon Open Channel Phase 2A
Infrastructure
Results
$21,123,100 CJ est. value
Long Beach, CA 90803

The Mark at Los Angeles
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Los Angeles, CA 90024

San Pedro Courthouse Redevelopment / Los Angeles
New Construction, Infrastructure, Build-out - 361,500 SF
Construction
$10,000,000 CJ est. value
Los Angeles, CA 90731

Crossroads of the World
Demolition, New Construction, Infrastructure - 285,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Los Angeles, CA 90028

Yucca Argyle Multi-Use Development
Demolition, New Construction, Infrastructure - 316,948 SF
Pending Verification
$180,000,000 CJ est. value
Los Angeles, CA 90028

Expo/Crenshaw Transfer Station Improvements - Los Angeles County Metropolitan Transportation Authority
Infrastructure, Renovation
Conception
$999,000,000 CJ est. value
Los Angeles, CA 90012

Harper on Sunset Mixed Use Development
Demolition, New Construction, Infrastructure
Design
$97,000,000 CJ est. value
West Hollywood, CA 90046

FY 2021-2022 Concrete Repair
Infrastructure
Post-Bid
$190,000 CJ est. value
Walnut, CA 91789

Last Updated 08/14/2023 11:28 AM
Project Title

Berths 238-239 Marine Oil Terminal Improvements

Physical Address View project details and contacts
City, State (County) Los Angeles, CA 90731   (Los Angeles County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of 8/14/2023 this project is put on hold. This project may rebid within the next three months as per the owner. An exact timeline for the rebid is not yet available. The Project consists of demolition and removal of the existing concrete loading/unloading platforms, catwalks, access ramps, mooring and berthing dolphins at Berths 238 and 239 and the construction of a new loading/unloading platform, access ramp, 2 berthing dolphins, 4 landside mooring dolphins, catwalks, installation of a new fender system at Berth 238 and improvements in accordance with Drawing No. 1-3341. From earlier posting: Project consists of a new marine oil platform at the PBF Energy Oil Terminal. The primary goal of the proposed new marine oil terminal at Berth 238 is to comply with MOTEMS standards to protect public health, safety, and the environment. The new terminal will consist of a new 125 feet by 58 feet unloading platform, berthing and mooring dolphins, catwalks, and an access ramp. The project will also require the demolition of the two existing unloading platforms located at Berths 238 and 239, and other existing mooring and berthing dolphins. The proposed project would also include a new 30-year lease. Online Q&A Yes Q&A Deadline 06/26/2023 11:59 PM (PDT) Contact Info Amir Zavichi - (310) 732-0307 azavichi@portla.org Bids to Owner's Agent All correspondence should be addressed to Shaun Shahrestani, Chief Harbor Engineer Estimated Bid Value: $20,000,000 - $25,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents