Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

RFQ Design - Architect/Engineering Services for the Design of CDC/NIOSH Consolidated Cincinnati Research Facilities, Cincinnati, OH
Demolition, New Construction, Infrastructure - 235,000 SF
Bidding
$100,000,000 CJ est. value
Cincinnati, OH 45206

RFQ Design - Architect/Engineering Services for the Design of CDC/NIOSH Consolidated Cincinnati Research Facilities, Cincinnati, OH
Demolition, New Construction, Infrastructure - 235,000 SF
Bidding
$100,000,000 CJ est. value
Cincinnati, OH 45206

Design Services for East Hill Avenue Sewer Replacement
Post-Bid
Cincinnati, OH

Design Services for East Hill Avenue Sewer Replacement
Post-Bid
Cincinnati, OH

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

2020 Main Library Vine Street Plaza and Interior Renovations
Construction
Less than $19,300,000 est. value
Cincinnati, OH 45202

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Design Build For New Fire Training Center
New Construction, Renovation - 30,000 SF
Post-Bid
Cincinnati, OH

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Engineering, Planning and Development
Post-Bid

Smale Riverfront Park Design Services
Results
Less than $300,000 est. value
OH

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

Last Updated 08/18/2022 06:39 AM
Project Title

RFP Design - A&E Facility Perimeter Control and Site Security Garage and Maintenance Buildings

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45202   (Hamilton County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Southwest Ohio Regional Transit Authority (SORTA) is seeking services from A&E Firms to provide design services for the peirmeter control and site security for three of it's facilities. Solutions may vary from electro-mechanical security gates, bollard posts, fencing, security walls, and surveillance systems. The following are the locations of the facilities: Garages and Maintenance Buildings ACCESS: 1801 Transpark Drive, Cincinnati Ohio 45229 BOND HILL: 4700 Paddock Road, Cincinnati Ohio 45229 QUEENSGATE: 1401 Bank Street, Cincinnati, Ohio 45214 It is anticipated that the entire renovation/construction of the project would need to be completed by June to October 2023. The technical proposals for A&E work should consider this anticipated completion date in project approach The method of Contractor Selection has not been Determined at this timeThe Southwest Ohio Regional Transit Authority (SORTA) is seeking services from A&E Firms to provide design services for the peirmeter control and site security for three of it's facilities. Solutions may vary from electro-mechanical security gates, bollard posts, fencing, security walls, and surveillance systems. The following are the locations of the facilities: Garages and Maintenance Buildings ACCESS: 1801 Transpark Drive, Cincinnati Ohio 45229 BOND HILL: 4700 Paddock Road, Cincinnati Ohio 45229 QUEENSGATE: 1401 Bank Street, Cincinnati, Ohio 45214 It is anticipated that the entire renovation/construction of the project would need to be completed by June to October 2023. The technical proposals for A&E work should consider this anticipated completion date in project approach The method of Contractor Selection has not been Determined at this time

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents