Similar Projects
University Of Utah Generator And Switches
Term Contract
Bidding
Salt Lake City, UT 84112

BEH S 025 AHU 1 System Upgrade
Alteration
Bidding
$190,217 est. value
Salt Lake City, UT 84112

Kitchen Vent Hood Inspection and Cleaning
Post-Bid
Sandy, UT 84093

Ingersoll Rand Compressed Air System Purchase and Install
Post-Bid

South Valley Services - HVAC Remodel/Construction
Results
West Jordan, UT 84088

Sorenson Multi-Cultural Center Phase 2, Pool Air Handler Replacement
Results
Less than $1,099,944 est. value
Salt Lake City, UT 84104

SD 100 HVAC Inverter Replacement
Post-Bid
Salt Lake City, UT

HVAC Equipment for Portable Classrooms
Results
Less than $50,000 est. value
Salt Lake City, UT 84115

Electric Heat Pump Water Heater
Term Contract
Post-Bid
Salt Lake City, UT

Air Sanitation System for Air Handlers
Results
South Jordan, UT 84095

Hydraulic Test Stand Chiller
Post-Bid
Salt Lake City, UT 84116

DFCM Construction - Pre-Qualified General - DOH Cannon Health BAS Chiller Upgrade
Results
Less than $1,239,552 est. value
Salt Lake City, UT

J041--660 - (S4) Emergent Air Handler Repair Bldg 2 Ahu Repairs
Post-Bid
Salt Lake City, UT 84148

Radiology Lab Chiller Replacement
Results
Less than $400,000 est. value
Salt Lake City, UT 84112

Replace Chillers
Term Contract
Post-Bid
Salt Lake City, UT 84116

Last Updated 02/23/2022 10:45 AM
Project Title

Dfcm Construction-Pre Qualified Mechanical-Matheson Courthouse HVAC Upgrade

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84111   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

All of the VAV box controllers, related network equipment, VAV reheat valves, perimeter heating valves shall be upgraded to a new Niagara N4 system. This upgrade will include a local control server as well. All remaining pneumatic controllers for large CHW / HW valves shall be upgraded to electronic valves as part of this project. Project also includes rebuilding the existing 400 ton Trane chiller.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents