Similar Projects
Hamilton County - Alms & Doepke Building Cooling Tower Replacement
Bidding
Cincinnati, OH

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Exterior Envelope Repairs and HVAC Upgrades of Building 1 at the Cincinnati Job Corps Center, Cincinnati, Ohio
Post-Bid
$1,000,000 to $5,000,000 est. value
Cincinnati, OH 45214

Power Plant Equipment/Centrifugal Water Chiller
Results
Less than $1,788,391 est. value
Cincinnati, OH

RTU - 1 Replacement Project
Results
Less than $266,757 est. value
OH

French Hall West HVAC Upgrade
Post-Bid
Less than $5,450,000 est. value
Cincinnati, OH

Primary Heat Exchanger Replacement (MSD Incinerator)
Results
Cincinnati, OH

Direct Source Capture Vehicle Exhaust System
Post-Bid
Evendale, OH

Fire Department Vehicle Exhaust Capture Project
Results
Less than $96,000 est. value
Springdale, OH 45246

Summit Behavioral Health (SBH) Cooling Tower Replacement
Post-Bid
Cincinnati, OH 45237

HVAC Preventative Maintenance and Repairs
Term Contract
Results
Cincinnati, OH 45202

Housing Repair Services - HVAC
Post-Bid
Cincinnati, OH 45202

No. 3 Primary Heat Exchanger Replacement
Results
Less than $967,000 est. value
Cincinnati, OH 45202

HVAC Services for TPS
Post-Bid
Cincinnati, OH 45214

HVAC Maintenance Services
Results

Reported 04/05/2019 12:00 AM
Project Title

PLCH Main Library 2018 Energy Retrofit Project (HVAC Upgrades)

Physical Address View project details and contacts
City, State (County) Cincinnati, OH   (Hamilton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description The estimate for the contract is: TC-05 HVAC Upgrades $2,735,000 Total: $2,735,000 The summary of work for the proposal in TC-05 is: Remove existing steam boilers and associated steam and condensate return piping, finned pipe, heaters and all associated accessories and controls. Install new pre-purchased high efficiency hot water boilers and hot water piping, finned pipe, heaters, controls and electric as indicated on the plans. Remove existing AHU`s and install new pre-purchased AHU`s. Replace associated ductwork, coils, electric, controls.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents