Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - Developer Partner
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Jacksonville, FL 32202

Four Seasons / Jacksonville
New Construction, Infrastructure
Design
$370,000,000 CJ est. value
Jacksonville, FL 32202

Broward Key
New Construction
Design
Jacksonville, FL

Intracoastal Waterway Jacksonville to Miami - Maintenance Dredging, 12- Foot Project, Palm Valley, South Reach
Infrastructure
Bidding
$10,000,000 CJ est. value
Jacksonville, FL 32202

Circuit 917 Relocation between 9B and I-95
Infrastructure
Bidding
$275,000 CJ est. value
Jacksonville, FL 32202

Capital Improvements Year 2 Group 8 Safety and Security Upgrades Project
Renovation, Infrastructure
Sub-Bidding
Jacksonville, FL 32202

Duvall County Public Schools - Safety and Security Improvements
Renovation, Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
Jacksonville, FL 32202

Realignment of Forest Street, Riverside Avenue, and Alfred Dupont Place Intersection
Renovation
Post-Bid
Jacksonville, FL

Baymeadows Park - Site
Post-Bid
Jacksonville, FL 32214

Construction Management at Risk Services for the Cecil Airport Eastside Development Site
New Construction - 370,000 SF
Results
Jacksonville, FL 32221

Southeast Quadrant Residential Phase 1A
Results
Jacksonville, FL

DCPS(Duval County Public Schools) Rutledge Pearson Elementary School
New Construction, Infrastructure - 95,933 SF
Construction
$15,000,000 CJ est. value
Jacksonville, FL 32208

Pattillo-Imeson
New Construction, Infrastructure - 173,000 SF
Construction
$17,084,978 est. value
Jacksonville, FL

Fairfield Inn & Suites by Marriott / West Jacksonville
New Construction, Infrastructure - 61,600 SF
Pending Verification
$9,910,000 CJ est. value
Jacksonville, FL 32254

Last Updated 08/19/2022 10:03 AM
Project Title

RFP Construction Management-at-Risk - Southside Integrated Piping System (SIPS) - Greenland, Davis, Burnt Mill Road

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32202   (Duval County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The owner has selected a Construction Manager. A timeline for construction has not yet been established. The purpose of this Request for Proposals (RFP) is to select a qualified proposer to provide Construction Manager at Risk (CMAR) services during design and construction of the Southside Integrated Piping System, (SIPS) - Greenland - Southside Blvd - Deerwood 3 to Greenland WTP 30" Water Main, Davis - Gate Pkwy to RG Skinner - 30" Reclaim Water Main and Burnt Mill Road 24" Force Main. For each area/project, the initial scope of work will consist of pre-construction phase services such as design and constructability reviews, construction phase sequencing, coordination, maintenance of traffic, and maintenance of utility operations pre-planning, alternatives evaluations, cost estimating and cost control (value engineering) services, project schedule development, and preparation and submission of an "open-book" Guaranteed Maximum Price (GMP) proposal for construction phase services. The SIPS - Greenland - Southside Blvd - Deerwood 3 to Greenland WTP 30" Water Main scope of work is expected to generally include the following: o Approximately 41,200 LF of 30-inch raw water transmission piping and fittings. o New 1.1 Mgal prestressed concrete storage tank and associated piping at the Greenland Water treatment plant. o Water Quality Monitoring Station o Greenland WTP SIPS Intertie Station o Supervisory Control and Data Acquisition (SCADA) System o Multiple trenchless crossings involving horizontal directional drill and/or auger jack and bore crossings of wetlands and major intersections. The Davis - Gate Pkwy To RG Skinner - Reclaim Water Main scope of work is expected to generally include the following: o Approximately 16,300 LF of 30-inch reclaim water transmission piping and fittings. o Multiple trenchless crossings involving horizontal directional drill crossings of wetland. The Burnt Mill 24" Force Main scope of work is expected to generally include the following: o Approximately 1,150 LF of 24-inch PVC sewer force main transmission piping and fittings Proposers may submit questions regarding this solicitation, provided that all questions must be submitted in writing to JEA Buyer listed below at least seven (7) business days prior to the opening date. Questions received within seven (7) business days prior to the opening date will not be answered. Questions: Buyer: Dan Kruck E-mail: krucdr@jea.com

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents