Similar Projects
RFQ Engineering - Greene Street Pump Station and Force Main
Infrastructure
Conception
$300,000 CJ est. value
Greenville, NC 27834

Ridgewood Farms
New Construction, Infrastructure
Conception
$47,700,000 CJ est. value
Winterville, NC 28590

SCADA Building for the Old Tar Gate Station Site
New Construction, Infrastructure
Design
$300,000 CJ est. value
Greenville, NC 27858

Gymnasium in the Alice F. Keene District Park - Pitt County
Addition, Infrastructure
Design
$3,700,000 CJ est. value
Greenville, NC 27858

Building Pad
Renovation, Infrastructure
Bidding
$1,200,000 CJ est. value
Greenville, NC 27834

Taxiway A South Rehabilitation
Infrastructure
Bidding
$1,200,000 CJ est. value
Greenville, NC 27834

Multiple High Pressure Natural Gas Facilities - Site Improvements
Infrastructure
Post-Bid
Greenville, NC

Forlines Pump Station and Force Main Improvements
New Construction, Infrastructure
Post-Bid
Greenville, NC 27858

Seal Coat and Stripe Parking Lot H. Boyd Lee Park
Infrastructure
Results
$10,620 est. value
Winterville, NC 28590

Milling and Resurfacing of NC 11 in Pitt County
Infrastructure
Results
NC

Dickinson Avenue Apartment Complex
New Construction, Infrastructure
Pending Verification
$57,000,000 CJ est. value
Greenville, NC 27834

Dickinson Avenue Apartment Complex
New Construction, Infrastructure
Pending Verification
$57,000,000 CJ est. value
Greenville, NC 27834

L T Hardee Road Townhomes
New Construction, Infrastructure - 360,000 SF
Design
$99,000,000 CJ est. value
Greenville, NC 27858

Royal Farms #493 / Greenville
New Construction, Infrastructure - 5,200 SF
Post-Bid
$1,400,000 CJ est. value
Greenville, NC 27834

Milling, Resurfacing, Widening, and Shoulder Reconstruction of Various Secondary Routes in Pitt County
Infrastructure
Results
NC

Last Updated 07/18/2023 12:27 PM
Project Title

Gymnasium and Special Needs Facility/Winterville - Pitt County

Physical Address View project details and contacts
City, State (County) Winterville, NC 28590   (Pitt County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected December 2024
Bids Due View project details and contacts
Estimated Value $6,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 18, 2023, an architect has been selected and this project is in the design phase. The stage of design and a firm construction timeline has not been determined. A detailed scope of work has not been released.

Details

56,000 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents