Similar Projects
Burr Oak State Park - Roof Replacements
Post-Bid
Glouster, OH 45732

Siprnet Service at Bldg 490, Rm 122, Fl 1, 5884 A St, Alpena, MI 49707 to Bldg 10271, Rm 128, Fl 1, 2721 Sacramento Street, Wright Patterson AFB, OH 45433
Post-Bid
Alpena, MI - Wright Patterson Air Force Base, OH 49707

2019 Facility Improvements
Results
Less than $2,253,600 est. value
Sylvania, OH 43560

Roof Replacement Project
Results
Napoleon, OH 43545

City Hall Roof Rehabilitation
Post-Bid
Greenfield, OH 45123

City Hall Roof Replacement, Repairs and Other Services
Results
Washington CH, OH

Muntz Hall Roof Rehabilitation
Results
Less than $825,000 est. value
Cincinnati, OH 45221

COSI Facility Partial Roof Replacement
Results
Less than $2,800,000 est. value
Columbus, OH 43215

Design-Build Services
Results
Less than $1,456,723 est. value
Columbus, OH 43211

Western Brown LSD Mount Orab Middle School Re-Roof
Results
Less than $240,000 est. value
Mount Orab, OH 45154

Coventry Branch Waterproofing
Results
Cleveland Heights, OH 44118

Wadsworth Public Library – Roof Replacement Project
Results
$61,331 est. value
Wadsworth, OH 44281

City Hall Emergency Roof Repairs
Results
Cleveland, OH 44114

Roof Replacements
Results
Cleveland, OH 44104

Mt Logan Roof Replacement - Chillicothe Local Schools
Results
Less than $416,843 est. value
Chillicothe, OH 45601

Last Updated 08/31/2020 11:36 AM
Project Title

Forest Service Lab Roof Replacement Project

Physical Address View project details and contacts
City, State (County) Delaware, OH 43015   (Delaware County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work for this project requires the Contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery, and all necessary valid licenses for the work summarized as follows: 1. Remove and dispose of Single-Ply roofing membrane. 2. Remove identified rooftop equipment, curbs, and penetrations; infill roof deck openings. 3. Full or partial tear-off of existing roofing system as directed. 5. Install additional wood blocking as necessary to accommodate additional roofing insulation and to support sheet metal flashing and trim. 6. Add to, or replace as necessary, fascia sheet metal; maintain existing profile. 7. Repair or replace damaged expansion joints. 8. Install retrofit roof drains. 9. Install new or additional roofing insulation as directed. 10. Provide tapered roofing insulation as necessary to achieve proper roof drainage. 11. Install new fully adhered Single-Ply roofing system, flashing, and manufacturer’s roof penetration devices. 12. Incorporate mechanical equipment, curbs to remain, and penetrations into the new roofing system. Follow roofing system manufacturer’s flashing recommendations.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents