Similar Projects
Lundbar Hills Backup Generator And Fire Pump Booster Replacement
Renovation, Infrastructure
Conception
Less than $250,000 est. value
Eureka, CA 95503

Mather Community Campus - Building 1706 - Install Addressable Fire Alarm System - P027987 - Sacramento County
Alteration
Conception
$1,200,000 est. value
Rancho Cordova, CA 95655

J035--Grease Hood Fire Protection Maintenance
Term Contract
Design
Palo Alto, CA 94304

Golden Gate Bridge Suicide Deterrent System Fire Training Tower Modifications
Alteration
Bidding
$2,500,000 est. value
San Francisco, CA

Fire Protection and Fire Alarm Systems Inspection, Maintenance and Repair Services
Alteration
Bidding
San Francisco, CA

Fire Alarm System
Renovation
Sub-Bidding
$300,000 CJ est. value
Ione, CA 95640

Fire Protection System Maintenance Services
Term Contract
Sub-Bidding
San Diego, CA 92101

Cain Library and SBS Building Fire Safety System Upgrades
Alteration
Post-Bid
$1,500,000 est. value
Sacramento, CA

New High Bay Sprinkler System in Purchasing Warehouse
Alteration
Post-Bid
Concord, CA 94520

Fire Alarm Maintenance and Monitoring Services
Alteration
Results
$90,702 est. value
Los Angeles, CA 90081

Kitchen Grease Hood Exhaust Fire Suppression System Replacement Installation
Alteration
Results
$250,000 est. value
Tehachapi, CA 93561

Welding Instruction Facility
New Construction
Pending Verification
$2,900,000 est. value
Fontana, CA 92335

Paul F. Hom M.D. Primary Care Facility - Replace Fire Alarm System - P956621 - Sacramento County
Alteration
Conception
$770,000 est. value
Sacramento, CA 95820

812 CES Fire Department Public Announcement System Installation and Maintenance Services
Term Contract
Sub-Bidding
Edwards, CA 93523

H112--644 Fire Extinguisher Inspection & Maintenance
Term Contract
Post-Bid
Phoenix, Prescott, AZ - Loma Linda, CA - Albuquerque, NM 85012

Last Updated 08/17/2022 11:32 AM
Project Title

Water Based Fire Protection System Fire Alarm System Inmate/Ward Labor Program California State Prison, Solano

Physical Address View project details and contacts
City, State (County) Vacaville, CA 95687   (Solano County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $124,995 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Water Based Fire Protection System Fire Alarm System Inmate/Ward Labor Program California State Prison, Solano

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents